| Activity | Area | Description | ||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Acquire a fixed asset and business object through a purchase order |
Finance | You can acquire a fixed asset and a business object directly through a purchase order in Rental Management. This process avoids using the Inventory to fixed asset journal. Note: On the fixed asset line, set the New fixed asset field to Yes and enter a value in the Fixed asset group field. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Activate work order template |
Service and Maintenance | You can activate a work order template when it is ready for use. An active template enables you to create work orders and work order lines. You cannot use inactive templates to create work orders. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add default order settings |
Fleet and Warehouse Management | You can add default order settings. In default order settings you can for example set up default location information (site and warehouse), default settings like items sales tax group, or default work order template id for rental and sub-rental items. This process explains how to set up default location information (site and warehouse), default items sales tax group, and default work order template id for rental items.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add default order settings |
Fleet and Warehouse Management | You can add default order settings. In default order settings you can for example set up default location information (site and warehouse), default settings like items sales tax group, or default work order template id for rental and sub-rental items. This process explains how to set up default location information (site and warehouse), default items sales tax group, and default work order template id for rental items.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add a bulk item to the sub rental order line |
Purchasing | You can select a bulk item to rent equipment in large quantities. Bulk items are not uniquely identified and do not have a serial number. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add a rental object with a fuel tank to a rental order |
Rental and Sales | Add a rental line to the rental order using a fuel consuming rental type The preferred fuel type of the customer will be included by default in the rental line editor. Changes may be made to substitute other allowed fuel types if needed. A warning message will be displayed if a fuel type other than the default is selected.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add a serialized item to the sub rental order line |
Purchasing | You can select a serialized item to rent uniquely identified equipment. Create the serial number from the sub rental order line. This can be an internal or vendor-provided serial number. Note: You can only enter a quantity of one for a serialized item. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add a Task requirement |
Service and Maintenance | A task is a description of the work for a project. The work order template defines the tasks on a work order. You can link a work order to sales, purchase, or rental orders through the work order template. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add assembly journal line with rental item |
Service and Maintenance | Add assembly journal line with rental item | ||||||||||||||||||||||||||||||||||||||||||||||
|
Add assembly journal line with stock item |
Service and Maintenance | Add assembly journal line with stock item | ||||||||||||||||||||||||||||||||||||||||||||||
|
Add bulk item to purchase order line |
Purchasing | You can add a bulk item to a purchase order line to procure it. A bulk item has no serial number and is usually procured in large quantities. You can assign a fixed asset number in one of the following ways:
A bulk item does not have its own business object number. When you purchase a bulk item, the related business object quantity is updated. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add calendars to resource |
Fleet and Warehouse Management | Resource calendars are optional. You can set up calendars to define the working times for a resource. You can enter an expiration date for each calendar. To view expired calendars:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add date when depreciation was last run |
Finance | A finance specialist must manually add the depreciation date and align it with the 'depreciate until' date. If depreciation was already posted for the fixed asset, the system fills in this date automatically. This date then becomes the 'date when depreciation was last run'. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add depreciate until date |
Finance | You must add the 'depreciate until' date. This date must match the 'date when depreciation was last run' in the books. This field helps a finance specialist validate the fixed asset and related business object. After validation:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add expense forecast |
Rental and Sales | Prerequisite: An existing project must be available. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add fee forecast |
Rental and Sales | Prerequisite: An existing contract must be available with a billing rule. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add fuel defaults to customers |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Add fuel item as a supplementary rental item to a product |
Rental and Sales | Add a fuel item as a supplementary rental item to a product that requires refueling. Set the following values:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add fuel tanks to business objects |
Rental and Sales | Business objects that consume fuel must have a fuel tank added prior to being added to a rental order. 1. Set the Enable Fuel Tank toggle to yes in the Miscellaneous tab of the business object. 2. In the business object tab, click fuel tank 3. Click New 4. Enter the fuel type, capacity, and current quantity and select Main fuel tank in the main tank field. Each object can have only one main tank. 5. Add additional fuel tanks if applicable. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add fuel transaction |
Rental and Sales | Open the fuel transactions screen in the fuel management section of the Rent tab. Click new record. Select the rental order, and select the object requiring fuel from the drop down. Select the fuel tank, the fuel type will default from the tank selection. Select the refuel date, transaction type, fuel method, and quantity. Click ok. The fuel transaction line will be added in open status. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add hour forecast |
Rental and Sales | Prerequisite: An existing project must be available. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add item forecast |
Rental and Sales | Prerequisites: A project must already exist. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add item requirements to task |
Service and Maintenance | You can add required items to a task. These items are needed to complete the task and are often called service kits or packs. The items are added to the work order line when you create the work order with the linked task. Each line in the item requirements must include the item, the required quantity, and the unit. When you add item requirements to a task, you can choose between two item setup options:
Note: Items used for item requirements must be of type Inventory. You can access and maintain item requirements from a work order line. Based on the status group setup on the Registration tab, you can also create new item requirements from the work order line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add line with negative quantity on purchase order |
Purchasing | Add a negative line to an existing purchase order if you need to return an uninvoiced item to the vendor. This reverses inventory and price transactions. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add lines to delivery journal manually |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Add maintenance plan |
Service and Maintenance | You can add a maintenance plan to an item. A maintenance plan may be required for business objects that you use. When you create a business object from a product, the default maintenance plan is automatically added to the record. You can add several maintenance plans to an item. For example, you can use a time-based and a consumption-based maintenance plan. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add manual price components |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Add pictures |
Service and Maintenance | You can take pictures of the object that is related to the task. If you save a picture:
Note: If you work offline, uploading picture to SharePoint and adding it to work order line is only done when you synchronize to D365 FO. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add pictures |
Service and Maintenance | You can take pictures of the object related to the task. If you save a picture:
Note: If you work offline, the upload and link to the work order happen after synchronization with D365 F&SCM. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add project rental quotation line |
Rental and Sales | You can add one or several rental, sales, or service items to a project rental quotation. The quotation can include lines of different types:
To add a rental line, click the Add line button and complete the required fields:
This process explains how to add lines with sales or service items to a project rental quotation. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental group in the rental type sorting list |
Service and Maintenance | You can assign rental amounts, transport costs, insurance rates, and similar values to a rental type group in rental agreements. Before you can use the rental type group in a rental agreement, you must add it to the rental type sorting list in the rental parameters. This activity explains how to add the rental type group to the rental type sorting list. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with bulk item |
Rental and Sales | You can add a bulk rental item or service item to a rental order line. You can add these types of rental items to a rental order line:
For a serialized rental item, you must assign a business object. For a bulk rental item or service item, this step is not required. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with rental item |
Rental and Sales | You can add these types of rental items to a rental order line:
The steps differ per rental item type. For a serialized item, you must assign a business object. For a bulk item, this is not required. You can set up estimated consumption on the rental order line using the consumption price line. This applies only to serialized items with the "Estimated+Actual" billing principle. You can assign a business object on:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with rental item |
Rental and Sales | You can add two types of rental items to a rental order line:
The steps to use these rental item types are different. For a serialized rental item you need to assign a business object to the rental order line. For a bulk rental item, this is not required. You can assign a business object to a rental order line on:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with sales item |
Rental and Sales | Use the steps in this topic to add a Sales/Purchase order line with service or sales item to the rental order. You can add sales or service items to a rental order. In order to do so, you need to choose the order line type: Sales/Purchase. For Services and Sales you can add three types of items:
Note: An on-rent date, expected off-rent date and an invoice profile are required on the rental order. For sales and service items this information would not be taken into account for price calculation or invoicing. This process explains how to add additional lines with service or bulk sales items to a rental order.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with sales item |
Rental and Sales | You can add a sales or service item to a rental order line. To do so, set the order line type to Sales/Purchase. You can add the following item types:
Note: The rental order must include an on-rent date, expected off-rent date, and invoice profile. These are not used for pricing or invoicing of sales and service items. This activity explains how to add additional lines with service or bulk sales items to a rental order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with serialized item |
Rental and Sales | You can add a serialized rental item to a rental order line. You can add the following item types to a rental order line:
The steps differ depending on the item type:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental order line with service item |
Rental and Sales | You can add a sales or service item to a rental order line. To do so, select the order line type: Sales/Purchase. You can add the following item types:
Note: The rental order must include an on-rent date, expected off-rent date, and invoice profile. These details are not used in pricing or invoicing for service and sales items. This activity explains how to add service or bulk sales items to a rental order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental quotation line |
Rental and Sales | You can add a rental or sales item to a rental quotation line. The following rental item types are supported:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental quotation line with bulk item |
Rental and Sales | You can add a rental or sales item to a rental quotation line. You can add the following rental item types:
The steps to add each item type are different. This activity explains how to add a bulk rental item to a rental quotation line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental quotation line with service item |
Rental and Sales | Add a service item to a rental quotation line. This activity explains how to add a service item to a rental quotation line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental supplementary item |
Service and Maintenance | To a supplementary item group, you can add:
You can only use these items on rental orders and rental quotations. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add rental type in rental type sorting list |
Fleet and Warehouse Management | In rental agreements, to a rental type, you can assign:
To use a rental type, add it to the rental type sorting list on the rental parameters page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add resource capabilities to resource |
Fleet and Warehouse Management | Multiple capabilities can be added to a resource. This is an optional setup. Capabilities can be setup on a task (under Task requirements). This can allow a validation when assigning the task to a resource from a plan board, whether the resource holds that capability to complete the task.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add resource group to resource |
Fleet and Warehouse Management | Adding a Resource group to a resource is optional. Resource groups can be used as a planning option within both Graphical plan boards (change Settings on the plan board to plan by resource group). A resource's link to a resource group can optionally have an expiration date setup.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add service item to purchase order line |
Purchasing | You can procure the service by adding the service item to the line. | ||||||||||||||||||||||||||||||||||||||||||||||
|
Add sub rental supplementary item |
Service and Maintenance | You can add rental items and sales or purchase items to a supplementary item group. These items are only available for use in sub rental orders. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add task requirements |
Service and Maintenance | You can define task requirements by attaching capabilities that a resource must have to complete a specific task. These requirements are used in the service or transport plan board. For example, a task might require a mechanic capability. Any resource assigned must have this capability. On a work order line, you can view, maintain, or create new task requirements linked to the work order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add tasks |
Service and Maintenance | You can add tasks to a template to define the tasks that must be completed. Work order lines are generated from the tasks in the template. You can add multiple tasks and set the sequence by using the up and down arrow buttons. On each task line, you can:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add the lines with item category |
Purchasing | Add lines for the items you want to include in the request for quote. If the item number is unknown, you can select line type Category when creating the line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add vendors and send request for quotes |
Purchasing | Add the vendors to whom the request for quote must be sent. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add work order task checklist |
Service and Maintenance | You can set up a checklist for each specific task. Each line includes a group ID and sub task ID to identify the type of check. Include a short description for each check. Examples include: check damages repaired, ensure object is working, refill fuel, and verify safety standards. You can add checklists line by line or as sub task groups. Multiple groups can be added to the same work order task checklist. Sub task groups are explained in the related activity: Create sub tasks group. On the work order line, you can access the checklist, maintain existing checks, and create new ones. You can mark each checklist item as passed or failed from the work order line or in the MobileApp. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add work order to Purchase order header |
Purchasing | You can manually add a work order template to the purchase order header. This action creates a work order that includes tasks defined in the template. Add tasks such as receival tasks with checklists to the template as needed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Add serialized item to purchase order line |
Purchasing | You can add a serialized business object to a purchase order line to procure it from a vendor. After you assign a serial number, the business object is automatically created. The following fields are updated for the created business object:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Add/remove supplementary items |
Rental and Sales | You can revise a rental quotation to add or remove supplementary items. This activity describes how to modify the quotation accordingly. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Adjust Reply |
Purchasing | |||||||||||||||||||||||||||||||||||||||||||||||
|
Adjust the rental quantity and post the journal |
Fleet and Warehouse Management | Enter the counted rental quantities from the print-outs in the recordings. Then, post the rental counting journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Apply miscellaneous charges from Active pan |
Rental and Sales | You can apply miscellaneous charges to a rental order. This activity describes how to add these charges, including at the line level. Note: To add charges at line level, go to the rental order line, then click: Financial > Charges > Maintain charges. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Apply miscellaneous charges from Active pane to Rental Quotation |
Rental and Sales | You can apply miscellaneous charges to a rental quotation. You can do this in two ways:
You can use the Active pane to apply the charges to the quotation directly. Note: You can also apply charges on the line level. Select a quotation line and go to: Financial > Charges > Maintain charges. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign Business object on the service plan board |
Fleet and Warehouse Management | |||||||||||||||||||||||||||||||||||||||||||||||
|
Assign business object to rental order line |
Rental and Sales | You can assign a business object to a rental order line with a serialized rental item. The business object must be in inventory. Depending on the work order template, you can assign the business object in two ways:
To assign the business object from the service plan board, follow the steps in the Order fulfillment process. Cross-company business object physical owner update (serialized rental) Business object parameter To support cross-company rental, you must set the global parameter 'Allow automatic change of physical owner' to Yes in the Business object parameters page. This setting updates the physical owner automatically when you move a serialized business object between legal entities during processes like rental quotation, rental order, picking, return, and transfer receipt using Rental Management or Logistics Scanning. Business object physical ownership log You can update the physical owner multiple times in one day. In this case, the ownership log allows overlapping transactions. The latest entry by created date and time determines the current owner. When you update the log, follow these rules:
Business object assignment
Note: You can only enable the checkbox if the parameter 'Allow automatic change of physical owner' is set to Yes. Cross-company assignment does not apply to rental transfer orders. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign business object via transport plan board |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Assign MOA to reviewer by starting Review process |
Rental and Sales | After completing the query and update, the MOA must be officially reviewed before processing the update to orders. After selecting Mark for review, the MOA journal is now locked, meaning users can no longer enter and update the lines. Only the approver has access to update and review this update. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resource to work order on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resource to work order on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to the Work Orders' tasks by Assign functionality |
Fleet & Warehouse Management | You can use the Rental Management service plan board to assign work order tasks to staff who are available and qualified. The board shows tasks that require scheduling and resources that match the requirements. If you remove the capability filter from the Assign resource page, a supervisor can select any resource from the list. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to the Work Orders' tasks by Assign functionality |
Fleet & Service Management | You can use the Rental Management service plan board to assign work order tasks to staff who are available and qualified. The board shows tasks that require scheduling and resources that match the requirements. If you remove the capability filter from the Assign resource page, a supervisor can select any resource from the list. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to work order |
Fleet & Warehouse Management | You can use the Rental Management service plan board to assign work order tasks to staff who are available and have the right skills. The page shows the tasks that need scheduling and the available resources that meet the requirement criteria. To select any resource, remove the capability filter from the Assign resource page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to work order on Service plan board (overriding Capabilities) |
Service and Maintenance | You can use the DynaRentD365 Service plan board scheduling tool to assign work orders’ tasks to staff who have the availability and the appropriate skill set. It displays the tasks for scheduling and the available resources that meet the criteria on the requirement. Removing the capability filter from the 'Assign resource' form allows the Supervisor to select any resource from the list. | ||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to work order on Service plan board (overriding Capabilities) |
Service and Maintenance | You can use the Rental Management service plan board to assign work order tasks to staff who are available and have the right skills. The board displays the tasks and available resources that match the requirement criteria. Removing the capability filter on the Assign resource page lets the supervisor select any resource from the list. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to work order on Service plan board using drag-and-drop |
Service and Maintenance | You can use the DynaRentD365 Service plan board scheduling tool to assign work orders’ tasks to staff who have the availability and the appropriate skill set. It displays the tasks for scheduling and the available resources that meet the criteria on the requirement. Removing the capability filter from the 'Assign resource' form allows the Supervisor to select any resource from the list. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign resources to work order on Service plan board using drag-and-drop |
Service and Maintenance | You can use the Rental Management service plan board to assign work order tasks to staff who are available and qualified. The board displays the tasks to schedule and shows the resources that match the requirements. To assign any resource, remove the capability filter from the Assign resource page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign SET business object to rental order line |
Rental and Sales | You can assign a business object to a rental order line with a serialized SET rental item. You can only assign a business object that is in inventory. Depending on the work order template of the rental order line, you can assign a business object in these ways: Directly on the rental order. On the service plan board. This topic explains how to assign a business object directly on the rental order line. How to assign a business object on the service plan board is explained in the Order fulfillment process. | ||||||||||||||||||||||||||||||||||||||||||||||
|
Assign work order template to order header |
Service and Maintenance |
You can assign a work order template to the order header. This makes the template available for all lines in the order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign work order template to order header |
Service and Maintenance | On an order, a work order template can be assigned to the order header. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign work order template to order lines |
Service and Maintenance | On an order, a work order template can be assigned to the order lines (line by line manually) |
||||||||||||||||||||||||||||||||||||||||||||||
|
Assign work order template to order lines |
Service and Maintenance |
You can assign a work order template to each order line individually. This provides more control over how templates are applied. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Attach default maintenance plan to product details |
Service and Maintenance |
You can add one or more default maintenance plans to product details. Any business object created from this product automatically inherits the maintenance plan. These plans are visible on the business object record. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Audit trail |
Finance |
The audit trail shows an overview of all invoice runs. Each run generates a separate audit trail entry. You can track key details, such as scheduled dates, calculation dates, and invoice statuses. Fields in the audit trail overview:
Status indicators:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Audit trail clean up |
Finance |
You can clean up audit trail records for selected invoice runs using filters. If you start from the advanced rental invoicing page, the invoicing run ID is automatically filled in with its filters. Available filters:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Automatically create a purchase order (intercompany transaction) |
Purchasing |
This activity creates intercompany purchase and sales orders when the legal entity of the work order differs from the worker's legal entity. For example, if a worker from DEMF executes a work order in USMF, the used item triggers an intercompany transaction. The used item appears as a transaction in Work order project planning > Inquiries > Work order line employee app > Work order line transactions. After processing, the line status changes from New to Posted. A purchase order is then created in USMF. This order uses the default warehouse from the intercompany vendor. If none is set, the item’s default warehouse is used. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Automatically create a sales order (intercompany transaction) |
Rental and Sales | If the legal entity that created the work order is different from the worker's legal entity, an intercompany transaction is triggered. This transaction creates a purchase order and a sales order between the two legal entities. A corresponding item journal is also created in the project. This section explains how the sales order is created: The used and posted spare part in Field Service App appears as a new transaction line in the Work order project planning > Inquiries > Work order line employee app > Work order line transactions page. The Registration type is 'Item'. After processing, the transaction line status changes from New to Posted. A sales order is then created in the worker's legal entity, using the warehouse from which the spare part was consumed in the Field Service App. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Automatically create item journal (intercompany transaction) |
Service and Maintenance | If the legal entity that created the work order is different from the worker's legal entity, an intercompany transaction is triggered. This transaction creates a purchase order and a sales order between the two legal entities. A corresponding item journal is also created in the project. This section explains how the item journal is created: The used and posted spare part in Field Service App appears as a new transaction line in the Work order project planning > Inquiries > Work order line employee app > Work order line transactions page. The Registration type is 'Item'. After processing, the transaction line status changes from New to Posted. An item journal is then created on the work order line, linked to the project ID in the legal entity where the work order was created. The journal line uses the warehouse from the purchase order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Automatically create timesheet in work order |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Build a WBS |
Rental and Sales | This activity is done outside D365 F&SCM, but the process includes related steps in D365 F&SCM. A work breakdown structure (WBS) is a hierarchy of tasks that defines the work required for a project. It includes each task’s scope, cost, and duration. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Bulk fixed asset disposal |
Finance | Disposing of bulk business objects differs from disposing of serialized ones. You must use the bulk fixed asset proposal to dispose of child fixed assets. This Rental Management feature creates a journal for each child asset with the correct amount until the full quantity is reached. The child fixed assets are selected based on the first-in, first-out inventory logic. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Business object availability |
Rental and Sales | Use the Business object availability page in Rental Management to check which business objects can be assigned to a rental order. You can create rental orders, rental quotations, or work orders from this page. Only objects with an available or assignable status appear. If an object is not available or assignable, a red icon appears on the status. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Buy a rental business object |
Purchasing | You can use an intercompany purchase order to buy a rental business object or an inventory business object:
When you buy a rental business object, the system creates a fixed asset to inventory journal automatically. You do these steps in the buying legal entity. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Buy an inventory business object |
Purchasing | You can use an intercompany purchase order to buy a rental business object or an inventory business object:
When you buy a rental business object, the system creates a fixed asset to inventory journal automatically. This activity explains how to buy an inventory business object. You do these steps in the buying legal entity. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change consumption price on Rental line->Consumption price line |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change consumption price via Rental line editor |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change delivery date |
Purchasing | Vendors provide a delivery date for the equipment. On a subrental order, this is the requested delivery date and time. You can change this date if the vendor gives a new one. You can also use the requested delivery date and time in the graphical plan board. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change depot on the business object |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change estimated consumption on Rental line |
Rental and Sales | This activity is part of the Rental Management process. It determines whether a rental or subrental agreement applies to the rental order process. This activity is only used in Rental Management processes. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change estimated consumption on RLE for effective period |
Rental and Sales | This activity is part of the Rental Management process. It determines whether a rental or subrental agreement applies to the rental order process. This activity is only used in Rental Management processes. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change information header work order |
Service and Maintenance | On a work order header, you can edit these fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Change information header work order |
Service and Maintenance | On a work order header, you can edit these fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Change or add supplementary items via rental line editor |
Purchasing | You can change or add supplementary items to the subrental order. For example, add fuel to operate equipment. You can use supplementary items that are rental, sales, or a combination. The line type depends on the default order line type setup of the released product. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change physical owner of the business object |
Service and Maintenance | You can change the physical owner of a business object. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change project rental quotation price |
Rental and Sales | You can revise a project rental quotation when the price on a line is incorrect. You can revise the quotation before or after sending it to the customer:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Change recourse on task on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change recourse on task on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental order dates |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental order line dates |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental order line off-rent date |
Rental and Sales | To return a rental item, enter the off-rent date on the rental order line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental order off-rent date |
Rental and Sales | You can enter the off-rent date at the header level to return a rental item. This updates all lines in the rental order automatically. You can only change the off-rent date from the header if none of the lines were changed. For example, changes in rental dates or price will disable the synchronization. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental price via rental line editor |
Rental and Sales | You can change rental prices in a rental order if they are incorrect. Use the rental line editor to update the price. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental prices |
Rental and Sales | You can change a rental quotation if the rental price or discount is incorrect. Use the rental line editor to update the rental amount or the discount percentage. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change rental prices on the rental order line |
Rental and Sales | You can change the rental prices on a rental order line if they are incorrect. Update the price directly on the rental order line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change status |
Service and Maintenance | You can manually change the status of a task in the DynaRent Mobile app. You can change the status to:
Note: If you work offline, the status is only updated to D365 FO when you synchronize to D365 FO. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change status |
Service and Maintenance | You can change the status of a task in the Rental Management Mobile app. You can set the status to:
Note: If you work offline, the system updates the status in D365 F&SCM after synchronization. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change sub rental dates |
Rental and Sales | You can change sub rental dates if they are incorrect. When you change the header dates, the system also updates the dates on the sub rental order lines. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change sub rental order line dates |
Purchasing | You can change rental or delivery dates at the header or line level of a sub rental order. Rental dates you can change:
You can also change the requested delivery date/time if the vendor gives a different delivery date. Notes:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Change sub rental price via rental line editor |
Purchasing | For each sub rental order line, you can change the gross or net amount on the sub rental order line or with the rental line editor. Also, the change can be effective within a specific date range or not. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change the work order status to closed |
Service and Maintenance | After the item and hour journals have been added and posted. You must change the status of the work order. In this case we will change the status to closed. However, the status can be different from closed according to the process of the business. The status chosen is important as it will be one of the criteria's that you are able to filter on when you want to transfer the value add work order. Also, it is important to take into consideration the sequence of moving from one status to another. Therefore, you should consider configuring the status group of the work order tasks beforehand. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change unit price |
Purchasing | You can change the unit price on the line. The net amount automatically changes accordingly, for example in case of a discount. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Change vendor delivery date |
Purchasing | If you have agreed with your vendor on a different delivery date, update the delivery date on the purchase order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Check asset availability (Asset availability form) |
Fleet and Warehouse Management | The asset availability functionality provides an overview of the availability of all assets based on the status setup. To open the page, go to: Business objects > Business objects > Asset availability. Initially, the page shows no data. Steps:
You can view the following sections:
From the action tab, you can open related pages:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Check asset availability transactions |
Fleet and Warehouse Management | You can view all asset availability transactions. You can also use a separate feature to view all transactions for all rental items. This works like the Asset availability page but without filters. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Check invoice & VAT totals |
Finance | Check the total invoice amount and the applicable value-added tax before you finalize the invoice. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Check on hand inventory list before return |
Logistics | Check the available on hand inventory per item before processing a return. After the return, availability will increase. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Check on hand inventory listed after return process |
Logistics | Check the updated item availability in the on hand list. The return increases the item quantity by the amount specified. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Check out cart for Returning items |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Check the asset availability after the business object returned |
Rental and Sales | Check the status of the business object after off-renting it. Use the asset availability page to find the object using the object number or serial number. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Check the valuations of the fixed asset for the acquisition adjustment |
Finance | After posting the value transfer work order or acquisition adjustment journal, check the updated fixed asset value. The journal reflects the configured derived books. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Choose a synchronization mode |
Service and Maintenance | Select a synchronization mode for each task line in the template. This setup defines the requested start and end date/time on the work order line. The synchronization can be configured in three ways:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Close project |
Rental and Sales | The required steps depend on the project type:
If you closed the project too early, you can reopen it to post late transactions. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Close the Collection task (Mobile app) |
Finance | After completing the checklist tasks, the driver or collector closes the collection task. The return note document is generated automatically. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Close the Quality Check task (Mobile app) |
Fleet and Warehouse Management | You complete a separate quality check task for each product. Each task includes a list of checks required for that product. The quality check task is part of the assigned work order template for that product. After completing the checklist, the driver or collector closes the Collection task. The Return note document is generated automatically. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Collect the assets (Mobile app) |
Finance | The driver or collector uses the Mobile app to return the assets to the depot. The Collection task includes the following checklist:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Commercial exchange |
Rental and Sales | Perform a commercial exchange when a customer wants to change a rental object for personal reasons. For example, the object is too small. To process the exchange:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm amendments |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm assembly journal |
Service and Maintenance | Confirm assembly journal | ||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm business object service agreement |
Fleet and Warehouse Management | Confirm the business object service agreement after receiving the customer's response. This activates the business object service agreement. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm delivery journal |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm purchase order |
Purchasing | You can confirm the purchase order in two ways:
To view the confirmation document, go to the Purchase orders page. On the Action Pane, click the Purchase tab. In the Journals group, click Sub rental order confirmations. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm recall from maintenance plan to create recall work order |
Service and Maintenance | Confirm the recall on the maintenance plan after you complete the setup on the Recall fast tab. This creates a recall work order. If you enable the Critical field, a recall work order is created for each business object in the query range. You can confirm the recall in one of these ways:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm rental order |
Rental and Sales | Confirm the rental order after you finish creating it. This action generates a rental order document. You can send the document to the customer by email or mail. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm rental quotation |
Rental and Sales | Mark the rental quotation as Confirmed after the customer accepts it. A rental order is created automatically. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Confirm sub rental order |
Purchasing | You can confirm a sub rental order in two ways:
You can view the confirmation document on the Sub rental orders page. In the Action Pane, on the Sub rent tab, in the Journals group, click Sub rental order confirmations. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a new Prospect |
Service and Maintenance | You can create a prospect for a potential customer or account that has not yet done business with you. You can also link the prospect to a lead or opportunity. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a purchase order |
Purchasing | You can create a purchase order from the Accounts payable or Procurement and sourcing modules. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a rental order from the business object availability form |
Rental and Sales | You can create a rental order after filtering for available or assignable business objects. This gives you better control of your rental fleet. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a rental quote from the business object availability form |
Rental and Sales | You can create a rental quotation after filtering for available or assignable business objects. This helps you plan rentals and manage your fleet more efficiently. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a request for quote |
Purchasing | Create a request for quote when the item number is not known and you must compare vendor offers. This activity lets you collect and evaluate quotes from several vendors before proceeding. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a value add work order |
Service and Maintenance | Create a value add work order using a predefined template. Configure value transfer fields in work order parameters. You can transfer value by increasing the value of the existing asset or by creating a revision asset linked to the original. In this case, value is posted on the new asset. You can also define a minimum value for the value transfer, although it is not required. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a value add work order through a project |
Service and Maintenance | You can create a value add work order and link it to an existing project using the project number. After creating the work order and posting the hour and item journals, you can view them in the project FastTab by selecting the item or hour journals. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create a work order from the business object availability form |
Rental and Sales | Filter the available or assignable business objects in your rental fleet. From the Business object availability page, create a work order for the selected business object for delivery, maintenance, inspection, and more. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create an inventory transfer journal |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create an item journal for a value added work order |
Service and Maintenance | Create and post the item journal to add items that increase the value of the fixed asset or inventory item. Because site is mandatory in the product dimension, set up default order settings in advance to auto-populate the price, site, and warehouse. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Full credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Insurance credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Manual credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Manual price components credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Miscellaneous charges credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Price credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Rate code credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and add Rental stop credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create and check out cart for bulk items |
Rental and Sales | When adding bulk equipment to a rental cart, enter the item number and quantity to be rented. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create and check out cart for sales items |
Rental and Sales | Set the order line type to Sales/Purchase when adding sales equipment to a rental cart. This is required if the item's default line type is set to Depends on order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create and check out cart for serial items |
Rental and Sales | Assign a serial number to each line when adding serialized equipment to a rental cart.
Each rental order line for serialized items must have a quantity of one. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create and post disposal - sale journal |
Finance | Create and post a disposal-sale journal to remove a fixed asset from the books when it is no longer useful. The company receives a value from the sale, unlike a disposal-scrap. Both transactions are booked the same way financially but use different posting profiles. Set up a disposal-sale posting profile before using this journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create and post disposal - scrap journal |
Finance | Create and post a disposal-scrap journal to remove a fixed asset that has no remaining value. Unlike a disposal-sale, the asset is written off without generating income. Both transaction types use the same financial booking logic but require different posting profiles. Set up a disposal-scrap posting profile before using this journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create assembly journal |
Service and Maintenance | Create assembly journal | ||||||||||||||||||||||||||||||||||||||||||||||
|
Create batch invoice configuration |
Finance | Create a batch invoice configuration by selecting key parameters, records to include, and recurrence settings. For example, select the weekly invoice profile to include all related records. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create business object maintenance plan |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create business object service agreement |
Fleet and Warehouse Management | Create a business object service agreement to define a customer service contract. You can create agreements based on these business object categories:
You can choose from these relation types:
Specify a validity period for each agreement. Link the agreement to a project if it is created for a specific prospect. This activity focuses on agreements for a specific customer and a business object of type External. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create consumption based maintenance plan |
Service and Maintenance | Create a consumption-based plan to trigger maintenance based on usage, such as every 10,000 miles. Set the recurrence pattern and reset strategy:
Other key fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create credit |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create delivery journal |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create expense journal (projects) |
Rental and Sales | Create an expense journal from the project when related services are delivered to the customer. Fill in the following fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create fee journal (projects) |
Rental and Sales | Create a fee journal from the project when services are delivered and related fees must be registered. Fill in the following fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create hour journal |
Service and Maintenance | Create hour journals to register the actual hours of the resources that will be responsible for the job. You must specify from what times the resource will spend on the job. However, the cost/sales prices for the hours must be configured beforehand.
Detail fields on the journal:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create hour journal |
Service and Maintenance | Create an hour journal to register the actual hours worked by resources on a job. Set up cost and sales prices before registering hours. Fill in the following fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create hour journal (projects) |
Rental and Sales | Create the Hour journal from the project to register actual hours after delivering the services.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create inter company purchase order |
Purchasing | Create an intercompany purchase order to buy a business object from another legal entity. This action automatically creates a related intercompany sales order in the selling legal entity. Select an intercompany vendor account. The purchase order will automatically become an intercompany order. A corresponding sales order is created in the selling entity for the related intercompany customer account. Note:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create invoice proposal for credit lines |
Rental and Sales | Create an invoice proposal for credit lines to process rental-related financial postings. This proposal includes rental agreements that generate credit amounts. You can review and adjust the proposed lines before posting the final invoice. Ensure the invoice profile and project data are correctly set to apply the credit accurately. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create item |
Service and Maintenance | Create an item for rental purposes. Unlike regular sales or purchase items, rental items require a rental type. The rental type defines the kind of rental item the product will represent. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create item arrival journal |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create item requirements journal (projects) |
Rental and Sales | Use the item requirements journal to manage project-related consumption of non-rental items. Item requirements for items such as fuel and instruments are created automatically during the Transfer to project wizard from the project rental quotation. These item requirements remain open until delivery is processed. After delivery, post the packing slip for the item requirements lines to register consumption. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create maintenance work order (batch) |
Service and Maintenance | Run a periodic job to automatically create maintenance work orders for business objects that are due for time-based maintenance within a specific timeframe. All generated work orders are stored in the maintenance history. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create maintenance work order (manually) |
Service and Maintenance | Manually create a maintenance work order for a business object. For time-based maintenance, refer to the activity: Create maintenance work order (batch). For consumption-based maintenance, the plan must include an attached meter. Register a new meter value from the business object or work/rental order. If the value exceeds the threshold, a work order is created based on the default maintenance plan. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create new MOA header |
Rental and Sales | A header must be created for the Multi order amendment journal. This update journal can be used for many different bulk update cases. In this example, the business case is updating all rental order line price by 10% for one Customer account. Therefore the query filter being used is based on customer account.
Create the MOA header, adding description and reason code for this update. Other examples include; Extending expecting off rent dates, updating Invoice profiles etc. Note: The checkbox ''Include consumption price lines'' allows a separate functionality. If selected YES, MOA can update rental order lines and/or Consumption order lines if business is tracking and invoicing consumption/meter transactions. MOA allows price and other updates in bulk for the consumption order lines. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create new return order (RMA) |
Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create new sales order with negative quantity |
Logistics | Create a new sales order to process a return of a previously sold business object with the category External. Assign the business object to the sales order line using the Serial number field. You can view the object in the Rental tab on the order line. Enter a negative value in the Quantity field to indicate a return. After processing the return, the business object category changes to Inventory and becomes available for sale. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create Project contract |
Rental and Sales | Create a project contract to define the agreement terms with one or more funding sources. Each fixed-price project must be linked to a project contract. A funding source is usually a customer, but can also be a grant or internal funding from a business unit. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create Project invoice proposal |
Rental and Sales | Create an invoice proposal to review chargeable transactions before posting the invoice. To generate an invoice proposal, go to: Project management and accounting > Common > Projects > All projects > Manage action panel > New group > Invoice proposal. This activity helps you:
Before running the proposal, ensure that billable transactions have been posted to the project. If not, the selection windows will be empty. Follow these steps to create the invoice proposal:
As you select line items, the total invoice amount updates automatically. After confirming the required lines, click OK to review and post the invoice. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create Project rental quotation |
Rental and Sales | You can create a project rental quotation from either the Rental order management module or directly from the project. Available options:
This activity describes how to create the quotation from the project. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create projects |
Rental and Sales | When you create a fixed-price project, the system automatically generates a fixed-price revenue estimate project. For a fixed-price project, this setup is required:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create Purchase order from Rental order |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create recall plan |
Rental and Sales | Create a recall plan for a business object or group of business objects. Add a work order template that includes a recall task. Use a query to filter the business objects. If the Critical field is enabled, a work order is created for each object in the query. The following fields are used in the recall setup:
You can create or confirm a recall from the Recall menu item or the Default maintenance plan menu item. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental agreement |
Rental and Sales | You can create a rental agreement using one of the following types:
The rental agreement hierarchy is configured in the rental parameters. You can view the related rental agreement from the rental or sub rental order via the action pane. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental order |
Rental and Sales | Create a rental order to rent a rental item or sell a sales item to a customer. You can select rental or sales items and link the order to a customer. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental order |
Rental and Sales | Use a rental order to rent a rental item or sell a sales item to a customer. This topic explains how to create a rental order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental quotation |
Rental and Sales | You can create a rental quotation by selecting New. This opens a page that guides you through the steps to create the quotation header. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create Rental shop card for a worker |
Rental and Sales | Create a rental shop card for any worker who uses the rental shop functionality in the cockpit. The card links to the project and worker set up in the system. You must activate the card before use. All transactions for that card are processed using a single rental order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental transfer order |
Service & Maintenance | Create a rental transfer order to transfer business objects between warehouses. You can select the 'from' and 'to' warehouse on the order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental transfer order |
Service and Maintenance | Create a rental transfer order to transfer business objects between warehouses. You can select the 'from' and 'to' warehouse on the order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental type |
Fleet and Warehouse Management | This flow describes how you can create a rental type. You must add a rental type to a product to be able to use the product as a rental item. The following classifications for rental types are distinguished:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental type |
Rental and Sales | Create a rental type and assign it to a product to make it available as a rental item. The following rental type classifications are supported:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create rental type group |
Rental and Sales | Create a rental type group to categorize rental types for use in Rental Management. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create resource capabilities |
Fleet and Warehouse Management | You can define capabilities for resources, including expiration date, skill level, and priority. A higher priority indicates a better match for the task. Assign capabilities to tasks under Task requirements. This setup supports validation when assigning resources from the plan board. Configure the validation level in the Work order parameters > Capabilities section. Options include Warning, Error, Question, or None. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create resource groups |
Fleet and Warehouse Management | Use resource groups to plan tasks on graphical plan boards. Enable this option by updating the plan board settings to plan by resource group. Capability validation is not supported when using resource group planning. Set a default region calendar and return warehouse on the resource group. These apply to all resources in the group if not individually configured. Use the Calendars fast tab to define working times and optional effective and expiration dates. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create resources |
Fleet and Warehouse Management | Create resources to schedule tasks on the Service or Transport plan board in Rental Management. You can select from five resource types: Human resource, Business object, Vendor, Work location, or Tool. On the Resource category field, specify the type. Then complete the Relation account field:
Set up the Resource type, Default return warehouse, and Region calendar for the resource. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create return order line |
Sales |
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create return purchase order with RMA |
Purchasing | Create a return purchase order when the original purchase order is already invoiced and items must be returned to the vendor. The vendor provides a Return merchandise authorization (RMA) number. This number is required for returning items. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create Service for rental kit |
Service and Maintenance | A kit consists of a main item and one or multiple supplementary items. The main item is always a service. This topic explains how to create a service for a kit. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create service work order (manually) |
Service and Maintenance | Create a manual service work order for repair, maintenance, breakdown, or value add activities. To display the business object's work location in the work order and the mobile app, select a work location code. By default, the delivery address is used if no specific location is defined. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create service work order (Old Mobile App) |
Service and Maintenance | Create a work order from the Task details page in the Rental Management mobile app. You can also create work orders from the Home page or Object details page. When you confirm the work order:
Note: You cannot create work orders offline using the mobile app. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create sub rental order |
Purchasing | Create a sub rental order from the Rental order management module. Make sure to fill in the following fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create sub rental order from rental order |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create subscription fees |
Fleet and Warehouse Management | Create subscription fees for service subscriptions linked to business object agreements. You can generate fee transactions for one or more subscriptions at once. These transactions are used for invoicing. To view the transactions, go to: Work order project planning > All service subscriptions > Analyze > Transactions > Fee transactions. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create supplementary item group |
Service and Maintenance | Add a supplementary item group for use in rental orders, rental quotations, or sub rental orders. The group can contain different item combinations depending on the order type. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create the Counting journal header |
Fleet and Warehouse Management | Create a counting journal header by associating counting policies with counting groups. Counting groups can target assets with specific characteristics or thresholds. Counting codes include:
If the Period code is selected, enter the interval (in days) in the Counting period field. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create the FA to Inventory journal header |
Finance | Transfer a fixed asset to inventory at its net book value. The business object status changes to Inventory. The net book value is set to zero. Quantity is set to 1, and cost price is based on the asset’s net book value. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create the FA to Inventory journal lines |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create the Inventory to FA journal header |
Finance |
Record the acquisition of a fixed asset using an inventory-to-fixed-asset journal. Purchased or produced serialized items are added to inventory and become available for acquisition. The Finance department manually runs the journal to set the acquisition value equal to the item’s cost value. After posting, the on-hand quantity becomes zero. The New fixed asset field is set to No for all products. This also applies to purchase orders. Business objects first appear under category Inventory. After posting, they are updated to category Rental. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create the Inventory to FA journal lines |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create the Rental Counting journal lines |
Fleet and Warehouse Management |
Create new lines in the rental counting journal based on the specified interval. If the interval is 7 days and the last count was on January 1, running the job on January 5 does not create new lines. Running it on January 8 does, because the interval has passed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create time and consumption based plan |
Service and Maintenance |
Create a maintenance plan that uses both time-based and consumption-based triggers. Use the setting Both time and consumption-based to align both cycles under one plan. Either trigger can initiate the same maintenance work order, and both intervals are updated together. Example scenarios:
In the consumption-based section of the plan, you can set:
In the time-based section, define a time recurrence pattern, such as every two months. Set the reset strategy to recalculate the next maintenance date. You can configure how the next interval is calculated:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create time based maintenance plan |
Service and Maintenance |
Create a recurring maintenance plan based on time, such as every two months. Define a recurrence time pattern and a reset strategy to calculate the next maintenance date. The following options define how the next maintenance date is calculated:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create WBS |
Rental and Sales |
Go to Rental order management > Common > Project rental quotation > Lines > Maintain > Work breakdown structure to create the WBS during the quotation stage. You can import a predefined template using the Import button or define a new WBS for the current quotation. The system prompts whether to use the customer’s rate card or the default template rates. Select Yes to override the customer's sales prices.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Create work location |
Rental and Sales |
Create a work location code using an abbreviation or number to identify the location. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create work location group |
Rental and Sales |
Create a work location group when several work locations belong to the same area or project. Linking locations in a group allows you to use work location group pricing in rental agreements. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create work order (from rental order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Create work order task of type service |
Service and Maintenance | Create a task with the type Service to manage maintenance, repair, or inspection activities. These tasks appear only on the service plan board. Transport-type tasks appear on the transport plan board. You can also use service task types for transport planning when required. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Create work order tasks of type Transport |
Service and Maintenance | Create a task with a transport type to manage logistics activities on the transport plan board. Transport task types include:
Tasks with type Service appear only on the service plan board. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Credit the amount fully |
Rental and Sales | Credit the full invoice amount after posting by using the same calculation date as the original invoice. Check the invoice voucher to confirm the full discount for the credited period. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define and approve budgets |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define billing rule on the contract |
Rental and Sales | Set up billing rules on the contract to control which project transactions are included in invoices. This ensures that only valid and approved transactions are posted for billing. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define consumption groups on Rental agreement line (Agreement level) |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define consumption price components |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define date range on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define date range on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define estimated consumption on the Rental order header |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define invoice profile |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Define posting status setup |
Service and Maintenance |
You can configure the posting status tab on a task to automate document posting when a task reaches a specific status. For example, when a rental delivery task is marked as completed on the transport plan board, a packing slip is posted automatically if Auto-post is enabled. If completed through the MobileApp, the same rule applies. If Auto-post is disabled, a manual Post packing slip window opens to complete the process. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define rental agreement status |
Rental and Sales |
Set the rental agreement status to determine if it is active for use in operational and financial processes. The agreement becomes active when its status is set to "Confirmed". You can link each status to a reason code. Reason codes cannot be assigned to the initial Created status. Five standard statuses are available:
To define or update reason codes, go to the Reasons page under the Setup tab in the Rental order management module. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define rental transaction setup |
Service and Maintenance |
Use the rental transaction tab on a task to link work order line statuses to rental sub-statuses. This is an optional setup. For example, when a work order line is updated to “Created”, the related rental order status can automatically change to “Ordered”. This setup is essential for updating rental asset availability during maintenance and repair tasks, which are usually not tied to rental orders. To enable updates, define rental sub-statuses on work order line sub-statuses and set up asset availability triggers for the task. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define sales price |
Rental and Sales |
Define sales prices for project categories used in quotations. Go to: Rental Management > Common > Project rental quotation > Project rental quotations > Lines > Quote action pane > Sales price group.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Define the credit and collection on the customer account |
Finance |
Define credit limits for a customer when creating rental or sales orders. The limit can be mandatory and either limited or unlimited. You can also set an expiration date to control the credit period. New rental orders and quotations will use the latest credit limit settings. Existing rental orders must be updated manually if changes are required. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define the credit Insurance on the customer account |
Finance |
Set up credit insurance limits and customer statuses. The insured amount, along with effective and expiration dates, defines the insurance coverage. Use credit check statuses to restrict credit or transactions while still allowing actions such as payments or quotations. New rental orders and quotations will apply the latest credit insurance settings. Existing orders must be updated manually if changes are needed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Define the rental agreement specifics |
Rental and Sales |
Set pricing and agreement details in the rental agreement header. Key fields include:
Define pricing on the rental type or rental type group. Pricing includes:
Set prices per unit (day, week, hour, or liter), depending on your business needs. Use the default agreement to define and activate price tiers. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Deliver rental order line |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Depreciate a fixed asset |
Rental and Sales | Generate and post a depreciation proposal for a fixed asset. You cannot post depreciation beyond the fiscal year-end unless the next fiscal year is open. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Determine rental or sub rental agreement |
Rental and Sales | Select the rental category on the rental agreement header to define whether it is for rental or subrental processes. Use the relation account on the header to distinguish the agreement based on type. For example:
The relation account varies by agreement type. For example:
The relation account is disabled for default agreements, as these are not linked to specific customers, projects, or locations. You can create agreements for the following categories:
Rental categories are limited to these two standard processes. Rental agreements cannot be used for sales or purchase orders. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Disable rental parameter for MOA review |
Rental and Sales | Rental parameter must be disabled in order to activate the formal review of the MOA journal. This allowed an approved/reviewer user to lock the journal for updates and review and approve the journal before processing the updates. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Do task based on order note |
Service and Maintenance | In the Task notes, in the Order notes, you can find the task instructions. In D365 FO, on a work order line, an order note can be entered to instruct the field engineer on the task to be done. This order note can give any relevant information on the task. To enter an order note in D365 FO, on the Work order page, select a work order line, and click Additional notes, Line notes. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Do task based on order note |
Rental and Sales | Enter an order note on the work order line to instruct the field engineer. To add an order note in D365 F&SCM, go to the Work order page, select a work order line, and click Additional notes > Line notes. The note provides relevant task information and is visible in the Task notes section. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Do task based on task check list |
Rental and Sales | Use the task checklist on the work order line to instruct field engineers on required work. The checklist is often generated automatically from the work order template. It appears in the DynaRent Mobile App on the Task checklist page. When confirmed, each task’s status and notes are synchronized with the related checklist in D365 F&SCM. Note: If you work offline, synchronize with D365 F&SCM to update the task checklist. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Do task based on task check list |
Service and Maintenance | In the Task checklist, you can find the work to be done for the task. In D365 FO, for a work order line, a task checklist can be defined. Usually, the task checklist is added automatically based on the used work order template. A task checklist instructs the field engineer on the work to be done. If in D365 FO a task checklist is defined for the work order line, it is shown in the Dynarent Mobile App on the Task checklist page. When you confirm the task checklist, for each task in the task checklist, the task status and notes are synchronized to the task checklist of the related work order line in D365 FO. Note: If you work offline, the task checklist is only synchronized when you synchronize to D365 FO. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Enable rental parameter to Skip MOA review |
Rental and Sales | A rental parameter must be enabled in order to skip the formal review of the MOA journal. The formal review allowed a user (reviewer) to lock the journal for further updates, review and approve each line in the journal before processing. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Ensure business object back to category: Inventory |
Rental and Sales | Ensure the returned business object is set back to the Inventory category. This confirms the object is ready for future sales. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Enter task-related notes |
Rental and Sales | In the Rental Mobile Applications - Field Service app, you can view or enter the following types of task notes:
When you confirm the task notes, they are synchronized with the related work order line in D365 F&SCM. To view task notes, go to the Work order page, select a work order line, and click Additional notes > Line notes. If you work offline, synchronization happens when you connect to D365 F&SCM. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Enter task-related notes |
Service and Maintenance | In the DynaRent Mobile app, you can view or enter these types of notes:
When you confirm the task notes, these are synchronized to the task notes of the related work order line in D365 FO. To view the task notes in D365 FO, on the Work order page, select a work order line, and click Additional notes, Line notes. Note: If you work offline, the task notes are only updated in D365 FO when you synchronize to D365 FO. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Enter the requested start and end date/time of each task |
Service and Maintenance | The requested start and end date/time on the work order template populate automatically based on the synchronization mode defined in the template. If no synchronization mode is set, these fields remain blank, and the task will not appear on the plan board for scheduling. In that case, manually enter the requested start and end date/time on each task line in the work order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Enter the requested start and end date/time of each task |
Service and Maintenance | The requested start/end date and time on the work order template will automatically populate depending on the synchronization mode setup on the attached work order template. If this synchronization mode is not setup on the work order template, the date and time will be blank, meaning this task will not appear on the plan board to be scheduled on a resource. In this case if there is no synchronization mode setup on the work order template, manually enter the requested start/end date and time on the work order for each task line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Estimate a revenue |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Expense journal (Work order) |
Service and Maintenance | When the services are delivered to the customer, and you need to register spent hours, create the Hour Journal from the Project.
Enter details about the journal line:
4. Click Validate to check whether the journal is ready for posting. 5. If you are ready to post the journal lines, click Post.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Expense journal (Work order) |
Service and Maintenance | Register spent hours by creating an Hour journal from the Project after delivering services to the customer.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Expire rental agreements |
Rental and Sales | Set the rental agreement status to Closed when pricing details are outdated but the agreement information remains valid. Enter validity dates to ensure that outdated pricing is excluded from rental orders scheduled outside that period. Once set to Closed, the rental agreement cannot be reopened. Closed agreements serve as an archive and support business intelligence reporting. You can use reason codes for analysis through business intelligence tools. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Fee journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Fee journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Fill in applicable fields (General tab) |
Service and Maintenance | On the General tab of a maintenance plan, complete the following fields:
Note: Not all options apply to both time-based and consumption-based plans. Recall plans default to Never unless a template ID is added. Other fields include:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Fill in applicable fields (General tab) |
Fleet and Warehouse Management | On the General tab of a maintenance plan, complete the following fields:
Note: Not all options apply to both time-based and consumption-based plans. Recall plans default to Never unless a template ID is added. Other fields include:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Fill in estimated maintenance fields |
Service and Maintenance | If the maintenance plan will be used for estimated consumption, fill in the following fields on the Consumption based tab: - Use for estimated maintenance - enable to use maintenance plan in estimated maintenance calculation - Estimated maintenance advance margin - number of days in advance the estimated maintenance can be triggered |
||||||||||||||||||||||||||||||||||||||||||||||
|
Fill in start date/time and end date/time |
Service and Maintenance | Enter the start and end date/time in the Synchronization mode if Initialize only or Keep synchronized is selected. This setup determines the date and time on work order lines. Set values for each task individually. You can base the start/end date on:
You can base the start/end time on:
You can also add offset values based on units such as days, weeks, months, or years. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Find and review work order on Service plan board |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Find task |
Service and Maintenance | You can find work order tasks assigned to you in the Rental Management Mobile app. Available search options:
Note: Only tasks with status Planned or In progress are shown. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Find task |
Service and Maintenance | In D365 FO, work order lines can be assigned to you. The work order lines, which are assigned to you, are shown as tasks in your DynaRent Mobile app. To start work on a task, first find the tasks that are assigned to you. You can find tasks in several ways:
Note: Only tasks are shown with status 'Planned' or 'In progress'. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Find work order on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Find work order on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Find work order on Transport plan board |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Fixed asset to inventory journal |
Finance | Use the fixed asset to inventory journal to remove the fixed asset from the business object and immediately dispose of it. This also converts the business object into an inventory item so you can sell or write it down. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate an Inspection list |
Fleet and Warehouse Management | |||||||||||||||||||||||||||||||||||||||||||||||
|
Generate consolidated invoice, set query, printing and posting options |
Finance | Create consolidated invoices using specific settings that differ from standard rental order invoices. Set up the query, printing, and posting options before generating the invoice. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate delivery proposal |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Generate intercompany purchase order invoice |
Finance | You can generate the purchase order invoice from the intercompany sales order in the selling legal entity, if the sales invoice has been posted. The invoice number is automatically filled and matches the sales invoice number. This activity is performed by the selling legal entity. You can also generate the invoice from the intercompany purchase order in the buying legal entity, if the sales invoice is posted. For details, see vendor invoices. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate invoice, set posting & printing options |
Finance | Set up the posting and printing options to ensure that the invoice is posted, printed, and calculated correctly. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate line form WBS |
Rental and Sales | You can generate project rental quotation lines from the work breakdown structure. This avoids manually adding each line. Select the Create quotation lines from WBS button to import the WBS lines into the project rental quotation. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate sub rental invoice |
Finance | After receiving the purchase order, generate a sub rental invoice to start the invoicing process. Enter the invoice number, description, calculation date, and invoice date. You can update the match status now or just before posting the invoice. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate the Fixed Assets numbers (by line) |
Finance | The Business object module is integrated with the Fixed assets module. When serialized items are purchased or produced, they become available in inventory and can be acquired. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Generate the GL journal for posting rental costs |
Sales & Marketing | |||||||||||||||||||||||||||||||||||||||||||||||
|
Generate the Project invoice journal |
Sales & Marketing | |||||||||||||||||||||||||||||||||||||||||||||||
|
Generate vendor invoice |
Finance | Generate a vendor invoice after receiving the item. Enter the required invoice details. You cannot generate the invoice before the item is received. Once received, a fixed asset is created for the business object. This allows renting it out before acquisition is finalized. The acquisition is processed only when the vendor invoice is posted. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Go to MOA lines. Select and run query for rental order line retrieval |
Rental and Sales | A query must be chosen to retrieve and fill the MOA journal. The journal will fill with all rental order lines in the system related to your query entered and run. This is specific to the Multi order amendment business is using. In this example, the business case is updating all rental order line price by 10% for one Customer account. Therefore the query filter being used is based on customer account. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Include/Exclude business object service agreement maintenance plan |
Fleet and Warehouse Management | You can include or exclude maintenance plans based on existing maintenance plan codes. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Inventory adjustment journal |
Finance | Use the Inventory adjustment journal to write off a business object that no longer holds value. The object must be in the inventory category. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Invoice sales order |
Finance | If an intercompany sales order is delivered, invoice the sales order in the selling company. The invoice is issued to the buying legal entity. For more information, see Create sales order invoices. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Item journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Item journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Item tasks: Work order line action tab |
Service and Maintenance | New registrations can be created from and to the work order. These include new item requirements, purchase order, sales order, production order, purchase requisition, request for quotation, sales agreement, purchase agreement. This function can be found on the work order task line > Item tasks tab.
During the process of previously creating tasks to be used on this work order line, a Status group should have been setup. A status group is where setup can be done to allow/disallow certain registrations (and journals) depending on the current status/stage of the work order or disallow registrations completely.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Item tasks: Work order line action tab |
Service and Maintenance | You can create various types of registrations from the work order. These options are available for item tasks:
This action is available on the Item tasks tab of the work order task line. Ensure that a status group is set up for the work order line. The status group controls which registrations and journals are allowed or blocked based on the current status. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Maintain credit management for the customer |
Finance | Adjust credit limits for a customer or a customer group. You can also update the customer and credit group assignments. Create a temporary credit to override the customer's limit. After the specified end date, the original limit is restored. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Maintain rental agreement details |
Rental and Sales | Maintain the rental agreement details defined on the Rental agreement header and the Rental agreement pricing detail page. Pricing details are copied to rental and sub rental orders when the agreement status is set to Confirmed. Make sure the details from the activity "Define the rental agreement details" in the Created rental agreements flow are maintained. For more information, see the description of the activity "Define the rental agreement details". |
||||||||||||||||||||||||||||||||||||||||||||||
|
Maintain the release product |
Fleet and Warehouse Management | After releasing a product, add the required data to complete the setup. This includes parameters for handling fixed assets during purchases or sales of business objects. On the Rental section of the released product, set the following parameters:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Manage pricing on task |
Fleet and Warehouse Management | You can manage pricing for a service agreement on a business object. You can define pricing at these levels:
In the pricing section, define the following:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Manage replies |
Purchasing | Manage vendor replies and compare their offers. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Manage subscription |
Fleet and Warehouse Management | You can manage subscriptions for a service agreement on a business object. You can define pricing at these levels:
In the pricing section, define the following:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Manually change the asset availability status |
Fleet and Warehouse Management | You can manually change the asset availability status if needed. You can only change to statuses marked as "Allow manual change = Yes" in the asset status setup. When changing to a lower-priority status, the business object status does not update automatically. After the change, go to the Business object asset availability transaction page and update the end date/time of the active transaction to a value at least one second before the start of the new transaction. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Manually create a 'Repair work order (Mobile app) |
Logistics | The driver can create a new repair work order in the mobile app by selecting the New work order option. The work order appears in the Work orders list and can be scheduled from the Service plan board. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Mark project rental quotation as Canceled |
Rental and Sales | If a project rental quotation has been sent, you or the customer can decide to cancel it. In that case, mark the quotation as Canceled. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Mark project rental quotation as Confirmed |
Rental and Sales | If a project rental quotation has been sent and accepted by the customer, mark the quotation as Confirmed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Mark project rental quotation as Lost |
Rental and Sales | If the customer does not accept the project rental quotation, you can mark it as lost. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Mark rental quotation as Canceled |
Rental and Sales | If you or the prospect decides not to continue with a rental quotation, you can mark it as canceled. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Mark rental quotation as lost |
Rental and Sales | If the prospect does not accept the rental quotation, you can mark it as lost. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Mark the MOA lines for review, and approve the update |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Mark the rental period for credit |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
New work order template |
Service and Maintenance | Create a new work order template by entering a name and description. If needed, add a project group. The project group is only relevant if the Separate per work order line parameter is enabled in the Work order parameters of the Work order project planning module. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Open a work order |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Open a work order |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Open business object service agreement details |
Fleet and Warehouse Management | Open the Business object service agreement details page to maintain information about maintenance plans, pricing, and subscriptions. You can update agreement details and track maintenance plans from this page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Open project from service subscription |
Rental and Sales | When a business object service agreement is created, a project is either created or assigned to the agreement. You can open the project from:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Other general setup for task |
Service and Maintenance | You can configure several fields in the task setup under the Setup tab. Select a task category:
Additional setup options:
You can assign a work order line to a resource in the following ways:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Parent fixed asset disposal |
Finance | After disposing of all child fixed assets, you can dispose of the parent fixed asset using the standard fixed asset disposal journal. You can record the disposal as a sale or scrap transaction. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Partially credit the amount |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Perform an adjustment through the variance field |
Rental and Sales | You can use the variance field to adjust small discrepancies on subrental vendor invoices. This field is only editable on subrental order lines, not on purchase order forms. If purchase lines exist, standard purchase order features apply to those lines. You can only use the variance field if this is configured:
When the invoice is posted, the variance posts to the designated variance account. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Performing a credit check on a new customer |
Finance | You can block a new customer from rental or sales transactions until a credit limit is entered. This ensures no transactions occur before the credit check is completed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Pick business object from warehouse inventory |
Service & Maintenance | You can assign a business object from warehouse inventory using one of these options:
This activity explains how to pick the business object and assign it to the transfer journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Pick the On-hand Quantity with WHS dimensions |
Finance | Pick the on-hand quantity by journal line using advanced warehouse dimensions. The dimensions include:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Plan the resource on the transport plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post assembly journal |
Service and Maintenance | Post assembly journal | ||||||||||||||||||||||||||||||||||||||||||||||
|
Post delivery journal |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post estimate |
Rental and Sales | Prerequisite: A validated estimate must exist. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post expense journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post expense journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post fee journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post fee journal (Work order) |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post fuel transaction |
Rental and Sales | Fuel transactions must be posted. Once posted, the line will be added to the rental order as a delivered line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post GL journal |
Sales & Marketing | Post the general ledger journal to complete financial registration for the transaction. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post hour journal (Work order) |
Service and Maintenance | Post the previously created hour journal to register labor costs on the work order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post hour journal (Work order) |
Service and Maintenance | The purpose of this activity is to post the hour journal previously created. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post invoice and check voucher |
Finance | To finish the invoice process, post the vendor invoice. Before you post the invoice:
If the invoice includes a business object purchase, an acquisition journal is also posted for the related fixed asset. You can validate the posting by checking the voucher. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post item arrival journal and product receipt |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post item journal (Work order) |
Service and Maintenance | The purpose of this activity is to post the item journal previously created. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post item journal (Work order) |
Service and Maintenance | Post the previously created item journal to register item consumption on the work order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post multiple packing slips |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post packing slip |
Rental and Sales | After confirming a rental order, post the packing slip to deliver the rental object. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post product receipt |
Service and Maintenance | Post the product receipt for the negative line to return items to the vendor. After posting, review the receipt in the Product receipt journal page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post product receipt sub rental |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post product receipt via purchase order form |
Purchasing | |||||||||||||||||||||||||||||||||||||||||||||||
|
Post project Invoice proposal |
Rental and Sales | Select the required invoice lines. The total amount updates automatically. Click OK to review and post the project invoice. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post project revenue on rental project |
Sales & Marketing | Post project revenue on the rental project to register income against project activities. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post project transactions - Expense |
Rental and Sales | Post expense transactions for the project using the project expense journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post project transactions - Fee |
Rental and Sales | Post fee transactions for the project using the project fee journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post project transactions - Hours |
Rental and Sales | Post hour transactions for the project using the project hour journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post project transactions - item requirements |
Rental and Sales | Post item transactions for the project using the project item journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post rental shop transactions (Periodic job) |
Rental and Sales | Use this periodic job to process rental shop transactions for delivery and return. You can run it manually or schedule it to run in batch with recurrence. You can process delivery and return transactions either separately or together. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post the FA to Inventory journal |
Finance | This activity sets the status of the business object to Inventory. As a result:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Post the Inventory to FA journal |
Finance | The Finance department manually runs the Inventory to Fixed Asset journal to transfer the item value to the acquisition value. After posting, the on-hand quantity is set to zero. Business objects initially in the Inventory category are updated to Rental after the journal is posted. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post the packing slip for the rental item and fuel lines |
Rental and Sales | Post the packing slip for the rental item and fuel lines. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post the vendor invoice |
Finance | After resolving any discrepancies and updating the match status, you can post the vendor invoice. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Post transfer receipt |
Service & Maintenance | After the arrival is completed, you must receive the transfer order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Print and send return order confirmation |
Sales |
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Print Counting List |
Fleet and Warehouse Management | Print the Rental counting list report to review rental counting journal details. You can run the report from the Business objects > Rental counting > Print > Counting list page. You can choose to include or exclude the current rental quantity in the report. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Process acquisition adjustment journal |
Finance | Create an acquisition adjustment journal after transferring the value from a value add work order. The journal is generated but not posted automatically. Go to the Fixed asset journals page to review and post the journal manually. You can also use this activity for stock items. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Process advanced rental invoicing |
Finance | Use advanced rental invoicing to configure and automate invoice runs for rental orders. For example, set up a batch job for weekly invoicing based on invoice profiles. The table below describes the available configuration fields:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Process the MOA update in batch. All rental order lines will process updates. |
Rental and Sales | After a review (either formal with system locking or only user review), select ‘’Process’’. This will start the bulk update to all the order lines in the journal. A notification will appear that the process has begun. A notification will also appear once the update is complete. This can also be tracked via the batch job setup for the update. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Project - Create and add Insurance credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Project - Create and add Price credit amendment |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receipts list |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive now value for posting product receipt |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental bulk |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental bulk item arrival |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental purchase |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental purchase item arrival |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental serialized item |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental serialized item arrival |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive sub rental service lines |
Purchasing | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive transfer order |
Service & Maintenance | Orders can be received using the arrival overview. There are multiple optional filters/options to view available arrivals on the screen. Example of filters:
Once the optional filtering is complete, update the page, select the arrivals needed and start arrival. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Receive via Item arrival overview |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Receive via sub rental order form |
Purchasing | |||||||||||||||||||||||||||||||||||||||||||||||
|
Recieve business object |
Rental and Sales |
If a business object was purchased via an intercompany purchase order, you can receive it in the buying legal entity after the related intercompany sales order's packing slip is posted in the selling legal entity. You can also receive the business object from the selling entity’s intercompany sales order after posting the packing slip. To do this:
Note:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Register meter readings to the business object to create consumption based work orders |
Rental and Sales |
The consumption-based maintenance plan checks if a work order must be created based on the registered meter value. The plan uses recurrence, meter unit, and reset method settings. You can find the meter list on both the business object record and the work order. To register a new meter value, enter the transaction date/time and the new meter value. When the value exceeds the predefined recurrence, a new work order is automatically created. You can also register meter readings using the Field Service app. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Register mileage |
Rental and Sales |
If you travel for a task, you can register mileage for each leg of the journey, such as outward and return trips. When you confirm the mileage entry:
The fuel consumption item is defined in Rental Parameters, on the General tab, in the Fuel item field. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Register mileage |
Service and Maintenance | If you must travel for a task, you can register the mileage. For each task, you can register mileage several times. For example, to register the mileage of the outward journey and the return journey. When you confirm the entered mileage:
The item that is used to register fuel consumption is defined in D365 FO, in the Rental Parameters, on the General tab, in the Fuel item field. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Register other task-related costs |
Service and Maintenance | You can register task-related costs, also called fees. So, costs that are not hours or items. When you confirm a new costs entry:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Register other task-related costs |
Rental and Sales |
You can register task-related costs, also called fees, that are not related to hours or items. When you confirm a new cost entry:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Register used spare parts |
Service and Maintenance | You can register the items and spare parts that you use doing a task. You can scan a barcode or manually enter the item number or serial number of the used spare part. When you confirm the entered spare part:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Register used spare parts |
Rental and Sales |
You can register items and spare parts used during a task. Scan a barcode or manually enter the item number or serial number of the spare part. When you confirm the entry:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Release product |
Fleet and Warehouse Management | You can release one or several products to one or more companies. After releasing, the products are available for use in those companies. To complete the setup, you must add required data. These steps are described in the next activities. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Release product (old or duplicate version) |
Service and Maintenance | You can release one or several products to one or more companies. After releasing, the products are available for use in those companies. To complete the setup, you must add required data. These steps are described in the next activities. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Release work order to resource (s) |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Rental on-hand quantity and location |
Fleet and Warehouse Management | You can view real-time rental inventory levels using the On-hand Rental Inventory report in the Business objects module. The report includes warehouse locations such as the customer’s buffer, VANs, and depots. For each rental type, the on-hand grid shows:
You can run the report for a specific rental or transfer order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Rental period has ended |
Rental and Sales | After the rental period ends and the item is off-rented, return it to rental inventory using a return note or work order. Create a rental order with on-rent and off-rent dates to manage this process. For more details, see activity Create and send rental order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Rental shop Delivery transactions via Cockpit |
Rental and Sales | The rental shop cockpit provides an overview of rental shop transactions. You can filter by shop card to view delivery and return transactions. From the cockpit, you can create new delivery or return transactions using the Action Pane. Transactions from the rental shop cart are also visible here. Transactions are processed in real time. The on-rent date is set when you process the delivery, and the off-rent date is set when you process the return. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Rental shop Return via Cockpit |
Rental and Sales | You can create return transactions from the rental shop cockpit. Return options are based on the rental shop card, warehouse, site, and the number of items ready for return. The return date and time are processed as the off-rent date in the transaction. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Rental stop |
Rental and Sales | You can apply a rental stop to items on a subrental order line. The rental stop calendar ensures that selected rental periods are not invoiced. The following rental stop options are available:
Effectivity options include:
This activity explains how to apply a rental stop with free-range effectivity. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Rental stop (sub rental order) |
Purchasing | You can apply the rental stop calendar to subrental order lines to ensure selected rental invoice periods are not charged. The rental stop options include:
Effectivity options include:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Request change |
Purchasing | If change management is enabled, you can only edit a subrental order in Draft status. If the order is confirmed and needs to be changed, you can request a change. This resets the status to Draft so that you can make updates. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Request change purchase order |
Purchasing | If change management is active, you can only change a purchase order when its status is Draft. To change a confirmed purchase order, request a change. This action sets the status to Draft. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Requested Date/Time taken from Work order template |
Service and Maintenance | The requested start/end date and time on the work order template will automatically populate depending on the synchronization mode setup on the work order template. If this synchronization mode is not setup on the work order template, the date and time will be blank, meaning this task will not appear on the plan board to be scheduled on a resource. An alternative is to manually enter the requested start/end date and time on the work order task lines so the task will appear on the plan board. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Requested Date/Time taken from Work order template |
Service and Maintenance | The requested start and end date and time are automatically set based on the synchronization mode on the work order template. If the synchronization mode is not set, the fields remain empty. In that case, the task does not appear on the plan board. To make the task schedulable, enter the requested date and time manually on the work order task lines. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Return business object on rental order |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Return item and post invoices using standard rental invoicing |
Rental and Sales | Post the return note and invoice per the invoice profile setup. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review and amend generated lines by delivery proposal |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Review and confirm time spent on task |
Service and Maintenance | Before signing off a task, review the recorded time. You can:
Note: When working offline, synchronize with D365 F&SCM to create or update transactions. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review and confirm time spent on task |
Service and Maintenance | Before you sign off a task, review the recorded time. You can:
Note: If you work offline, the transactions in D365 FO are only created when you synchronize to D365 FO. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review budget vs Actual costs |
Rental and Sales | Use the Actual versus budget report to compare original budgets, revised budgets, actuals, and variances. The report includes:
The report groups data by budget model and dimension values. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review estimated costs and revenues |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Review individual rental order lines and update where necessary |
Rental and Sales | User should review the MOA update and lines within the MOA before either official review or processing the update. Often rental order lines may be queried in that are not applicable to the update or updates may be more line specific then the bulk update applied to all lines. In this example, one line has been removed from the journal, meaning it will no longer be included in the price update once processed. Additionally, two specific lines require individual price updates. Locate each of these lines and update the "New price" field by replacing the bulk-updated price with the correct line-specific price. Everything visible in the current MOA journal under ''New'' fields, is what will be update to the rental order lines once processed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review invoices |
Rental and Sales | Run the Customer invoice report for projects to view invoice details for a selected date range. Use the following parameters to filter the report:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Review mobile app transactions |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Review opened packing slip and post |
Logistics | |||||||||||||||||||||||||||||||||||||||||||||||
|
Review posted Project invoice journal |
Sales & Marketing | Review the posted project invoice journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review posted Project invoice journal |
Rental and Sales | Review the posted project invoice journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review profitability |
Rental and Sales | Run the Project profitability report to analyze profit or loss by project for a specified date range. Use the following invoice parameters to filter the report:
Review profitability When you generate this report, the following default parameters are shown. You can use these parameters to filter the data that will be shown on the report:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Review Project invoice proposal |
Rental and Sales | Review the Project invoice proposal. The proposal shows rental totals. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review Project invoice proposal |
Sales & Marketing | Review the Project invoice proposal. Rental totals. | ||||||||||||||||||||||||||||||||||||||||||||||
|
Review purchase invoice |
Rental and Sales | As the assigned reviewer, reviews the purchase invoice. There are several options for the reviewer to choose from. Also, a comment can be added to the purchase invoice submitter for instructions of any sort. Also, work items assigned to the reviewer can be found from the default dashboard or from the common module. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review purchase order |
Rental and Sales | As the assigned reviewer, review the purchase order. To finish the review, choose one of these options:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Review purchase order |
Purchasing | As the assigned reviewer, review the purchase order. To finish the review, choose one of these options:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Review rental agreement details |
Rental and Sales | The purpose of this activity is to review the defined and maintained rental agreement details. It is not possible to comment or add any references on the rental agreement (during the review). The rental manager can review the pricing details by exporting the rental agreement to Excel. It is not recommended to delete any rental agreement with invalid or out dated information. The details of the rental agreement can be used for any further analysis in the future by using a business intelligence tool. Also, it is recommended to change the description of the rental agreement to a number or name which stands for older version of rental agreements. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review rental order |
Rental and Sales | ➢ [Project Management and accounting> Common > Projects > All projects->Manage action panel->Related information-> Item task->Rental order] Open the Rental order created via the Transfer from Project rental quotation process. Manage the rental order delivery according the standard process:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Review sub rental order |
Purchasing | As the assigned reviewer, reviews the sub rental order. There are several options for the reviewer to choose from. Also, a comment can be added to the sub rental order submitter for instructions of any sort. Also, work items assigned to the reviewer can be found at : common -> common -> work items -> work items assigned to me
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Review sub rental order |
Rental and Sales | As the assigned reviewer, review the sub rental order. You can choose one of several options and add a comment for the submitter.
Go to: Common > Common > Work items > Work items assigned to me. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review the vendor payment |
Rental and Sales | Review the submitted vendor payment. Go to: Common > Common > Work items > Work items assigned to me. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review vendor invoice |
Finance | Review the submitted vendor invoice in the workflow. Approve, reject, or request changes as needed. If you request a change, update the invoice details and resubmit it to the workflow. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Review WBS |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Search item |
Service and Maintenance | You can search for item availability in a warehouse if you do not have the item during a task. Note: Offline mode does not support item search. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Search item |
Service and Maintenance | When doing a task, you can need an item that you don't have with you, You can search for this item's availability in a warehouse. Note: If you work offline, you cannot search an item. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Select an existing Prospect |
Service and Maintenance | In the list of prospects, you can open the record that you want to edit. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Select an existing prospect |
Rental and Sales | The Account field on the Work location card under Miscellaneous links to a prospect account. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Select Customer |
Rental and Sales | Select the customer account on the rental agreement. The pricing details in the agreement apply only to this account. You can change the customer account after confirmation if you have the necessary security privileges. You can define rental pricing for different time periods, such as by quarter. To update pricing, duplicate the previous agreement and edit the pricing details. A rental agreement can have these statuses:
You can optionally add a reason code and note when changing the status. Use the Canceled status to mark agreements with invalid information. Use the Closed status when pricing is outdated but information is still valid. Set validity dates to exclude agreements from rental orders outside the defined period. Use closed agreements for reporting and business intelligence. You cannot delete agreements unless they are in Created status. To find the related agreement, go to the General tab of the rental order and open the Related information section. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Select Invoice profile required for CBB price type |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Select order/invoice |
Sales |
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Select project invoice for credit |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Select rental type |
Service and Maintenance | Link the item to a rental type to enable rental pricing and related settings. This step is required to use the item in Rental Management activities. If a product is created from the [All products and product masters] list page and the rental type is not defined prior to release, or if the product is created directly within a legal entity via the [Released products] list page, the rental type can still be assigned or modified post-release—provided no item transactions have been recorded for the product. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Select Vendor |
Rental and Sales | Select the vendor account for a subrental agreement. This vendor is linked to the relation account on the agreement header and determines which pricing details apply. You can update the vendor account after confirmation if you have the required security rights. To adjust prices quarterly, duplicate the existing agreement and update the pricing details for the new period. Subrental agreements can have these statuses:
You can add a reason code or note when changing the status. This is optional. Fill in the validity dates to apply pricing only within the specified period. Use the Closed status to archive agreements and support business intelligence reporting. Reason codes are available for further analysis. You can’t delete subrental agreements unless they have the Created status. Find the related agreement on the General tab of the subrental order using the Related information section. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Sell a fixed asset through a rental order |
Finance | Sell a fixed asset directly through a rental order in Rental Management. When the serial number is entered on the order line, the system retrieves and converts the related fixed asset. The conversion journal is automatically created and posted at delivery. Note: You must change the order line type from Rental to Sales/Purchase before confirming and delivering the order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Sell the business object and fixed asset in a sales order |
Finance | To sell a business object and its related fixed asset through a sales order, make sure the settings are correct.
After processing the sales order, a fixed asset to inventory journal is created automatically. You must post this journal manually. Before posting, synchronize the depreciation dates. For more information, see the Depreciation dates activity. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Sell the business object in a sales order |
Finance | After converting a business object to an inventory item, you can sell it as a standard inventory item in a sales order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Send a business object service agreement to a customer |
Fleet and Warehouse Management | You can send a business object service agreement to the customer for approval. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Send quotation to the customer for approval |
Rental and Sales | You can send a project rental quotation to the customer for approval. When the quotation is ready, to post the quotation journal, click Quotation. Print the quotation if needed. After posting, the system creates a project rental quotation journal. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Send rental quotation |
Rental and Sales | After you complete the rental quotation, send it to the customer or prospect. You can send the quotation by email, mail, or other options. After you send the quotation, the status changes from Created to Sent. This applies only if it was not sent before. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Send rental quotation for internal approval |
Rental and Sales | This step is triggered automatically when workflow is enabled. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Service plan board settings |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Service plan board settings |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Set up an availability status |
Fleet and Warehouse Management | You can set up availability statuses to indicate the status of serialized assets in the rental fleet. You can also set up statuses based on predefined bulk statuses for use in the Asset availability page for bulk items. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Set up asset availability trigger |
Fleet and Warehouse Management | Configure the following fields when setting up an asset availability trigger:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Set up asset status language translation |
Fleet and Warehouse Management | You can add translations for asset statuses in several languages. Only statuses with Show on availability form set to Yes appear on the Asset availability page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Set up Business object meter |
Rental and Sales | If a business object uses a consumption-based maintenance plan, you must track its consumption. To do this, create a meter on the business object:
This setup helps you monitor consumption and schedule maintenance at the right time. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Set up resource type |
Rental and Sales | Link a resource type to a resource so you can filter it in the graphical plan boards. Open Settings and select the option to plan by resource type. In Rental Management, you can link the resource type to a standard project category. This setup supports automatic hour registration when a resource is planned for a task. This requires the Auto-generate (Hour) parameter to be enabled in the work order settings. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Set up work order template on Extended transport |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Setup a periodic job to create estimated consumption based maintenance work orders |
Rental and Sales | Set up estimated consumption maintenance plans with a recurrence. Use the Estimated consumption for maintenance job to release estimated maintenance work orders. Go to: Business object module > Periodic > Estimated consumption for maintenance To date needs to be defined. This date affects the calculation of the estimated maintenance and the maintenance work order creation. You can apply filters to include specific rental stock objects. For example, include only unavailable objects, objects purchased before a certain date, or objects from a specific object group. You can run this job in batch mode. If the checkbox 'Use system date in batch' is enabled, the system date will be used for estimated consumption calculation. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Setup a periodic job to create time based maintenance plans |
Rental and Sales | Set up time-based maintenance plans with a recurrence. Use the Create maintenance work orders job to release time-based work orders. Go to: Business object module > Periodic > Create maintenance work orders. The recurrence in the maintenance plan determines the To date in the periodic job. This date controls which tasks trigger maintenance project creation. You can apply filters to include specific rental stock objects. For example, include only unavailable objects, objects purchased before a certain date, or objects from a specific object group. In the dialog, enter a date to generate maintenance projects only for tasks with a next maintenance date on or before that date. You can run this job in batch mode. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Setup estimated consumption on the rental order line |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Setup fuel conversion table |
Rental and Sales | The fuel conversion table is used when fuel is transferred between countries. It is a mapping of fuel types/names used in each country for a business object. A record must be set up for the origin and destination for each pair of countries. The country and fuel combinations must exist in the fuel country quality table before they can be added. The setup can be found by going to Business Objects >Setup>Fuel management>Fuel conversion table. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Setup fuel country quality table |
Rental and Sales | The fuel country quality table must be set up before a fuel type can be used in each country. The country is taken from the business object location address. The setup is found under Business objects>Setup>Fuel management>Fuel country quality table. For each country, allowed fuel types must be added and given a numeric quality rating. A higher number equals higher quality. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Setup fuel item |
Rental and Sales | To use fuel management, create a fuel master product and release it to the legal entity. Set up the fuel item with these values:
Create one released item for each legal entity that uses fuel management. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Setup status group |
Rental and Sales | Define a status group when you create a task. The status group controls which statuses are available and in which sequence they are used. Use the Status setup tab to define valid transitions between statuses. This setup helps control system behavior and status changes. Use the Registration tab to define which processes can be registered on the work order line for each status. Examples include:
For example, you can allow sales order registration only when the work order has status Created. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Ship intercompany sales order |
Rental and Sales | When a legal entity buys a business object from another legal entity through intercompany trade, a sales order is created in the selling legal entity. Ship the intercompany sales order from the selling legal entity to the buying legal entity. The steps in this activity skip the picking process. You can perform the picking steps if needed. Note:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Ship transfer order |
Service & Maintenance | Post the ship transfer journal to prepare the business object for receipt by the receiving warehouse. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Sign off task |
Service and Maintenance | To complete a task, have it signed off by your contact at the customer site. Before your contact signs off the task, you can show the:
If you confirm a task sign-off:
Note: If you work offline, the actions for which an online connection is required are only done when you synchronize to D365 FO. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Sign off task |
Service and Maintenance | Have your contact at the customer site sign off the task to complete it. Before the sign-off, you can show the:
When you confirm a task sign-off:
Note: If you're offline, actions that require a connection are completed when you sync with D365 F&SCM. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Specify a type of agreement relation |
Fleet and Warehouse Management | Select a type of agreement relation to define how business object service agreement details apply. You can apply details like maintenance plans, pricing, and subscriptions at different levels:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Specify last on-rent date on the object |
Rental and Sales | Manually enter the last on-rent date for a business object that will be sold or written down. This step ensures the object is removed from rental availability. This update is not done automatically when posting the Fixed asset to inventory journal. You must complete it manually. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Submit for approval |
Finance | Submit a purchase invoice for approval through the workflow. Based on the workflow owner's decision:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Submit purchase invoice to workflow |
Purchasing | Submit the purchase invoice to the workflow so it can be reviewed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Submit purchase order to workflow |
Purchasing | Submit the purchase order to the workflow so it can be reviewed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Submit sub rental order to workflow |
Rental and Sales | Submit the sub rental order to workflow for review by the rental manager. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Submit sub rental to workflow |
Purchasing | Submit the sub rental order to the workflow for rental manager approval. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Submit timesheet |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Submit to workflow |
Finance | Submit the vendor invoice to workflow for review by the finance manager or workflow owner. They can approve, reject, or request changes. If changes are requested, the invoice returns to the submitter for updates. If rejected, you must create and resubmit a new invoice. When approved, a notification is sent and the invoice can be posted. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Technical exchange |
Rental and Sales | A technical exchange is needed when the rental object breaks down due to a reason not caused by the customer, such as a malfunction or required maintenance. You must replace it with a working equivalent object. To perform a technical exchange:
Note: You cannot request a different item during a technical exchange. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Test Activity Mazen |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Transfer project rental quotation to rental order |
Rental and Sales | After confirming the project rental quotation, transfer it to an actual project. Then, run the wizard to create the rental order. Note: If several project rental quotations link to the same project ID, the wizard adds all lines to a single rental order. This activity applies to existing projects with no transfer to forecast but with a transfer to item requirements and rental order. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Transfer Rental order costs |
Rental and Sales | You can transfer rental order costs to the project before posting the invoice. Set Transfer to project to Yes, and then use the Transfer to project button on the Rental order > Invoice page. This action generates a project journal and posts the rental costs to the project. You can run it in batch or trigger it manually. On the Posting invoice page, define the calculation date and other parameters. After you click OK, the system generates the project hour journal and allocates all rental costs—including insurance, transport, and warranty—based on item categories. Check the results in: Project > Manage > Posted project transactions. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Transfer the value of a work order |
Service and Maintenance | After posting the item and hour journals and updating the work order status, transfer the value of the work order. You can run this as a batch or manually with filters. Optionally, add more tables to define criteria. Based on your selection, the journal is created and a log shows which work orders were processed. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Transfer the WBS to a forecast |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Transport plan board settings |
Service and Maintenance | Configure the transport plan board settings to customize the view before scheduling tasks. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Unassign recourse from task on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Unassign recourse from task on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Update line: Work order line action tab |
Service and Maintenance | You can update the work order status from the Task line using the Update line tab, based on the setup in the Work order status group. You can also change the task status from the plan board after scheduling the task to a resource. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Update line: Work order line action tab |
Service and Maintenance | A work order status can be updated from the work order task line on the work order. Go to the work order > Task line > Update line tab. A task status can also be updated on the plan board after the task has been scheduled to a resource. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Update match status |
Finance | You can update the match status on a vendor invoice to compare invoice prices with the subrental order prices. This step is recommended but not mandatory. Invoice total matching is done at line level only. If the price difference is too large, the actual invoice total does not match the expected total. This threshold is defined in the Accounts payable parameters. Price variance is also validated per invoice line. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Update task status on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Update task status on Service plan board |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Update the status of the planned task |
Logistics | Update the task status when the resource has completed the planned task. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Update work order status |
Service and Maintenance | |||||||||||||||||||||||||||||||||||||||||||||||
|
Use default plan as template to manually add business object record |
Service and Maintenance | You can define a maintenance plan at the business object level. Select a default maintenance plan to act as a template for the business object's maintenance plan. You can choose from existing default plans or those defined in the product from which the rental type originates. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record break time |
Service and Maintenance | Use the break time ticker to record the time you use on a break. Use this time ticker if take a break. You can only use the break time ticker if the job time ticker is recording. When you end the break time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record break time |
Service and Maintenance | Use the break time ticker to record break time. You can only start it while the job time ticker is active. When you stop the break time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record extra time |
Service and Maintenance | Use the extra time ticker to record additional work time after completing a task. Reopen the task if needed to track the extra time. When you stop the job time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record extra time |
Service and Maintenance | Use the extra time ticker to record the extra time you work on a task. Use this time ticker if you start working extra time on the task. For example, when you have completed a task and some additional work is required. You can reopen the task and record the time spent as extra time. When you end the job time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record travel time |
Service and Maintenance | Use the travel time ticker to record the time you travel for a task. When you start the travel time ticker, and the task status is 'Planned', the task status is set to 'In progress'. Also the related work order line status in D365 FO is set to 'In progress'. When you end the travel time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record travel time |
Service and Maintenance | Use the travel time ticker to track time spent traveling for a task. If the task status is Planned, starting the ticker updates it to In progress. The related work order line status in D365 F&SCM also changes to In progress. When you stop the travel time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record working time |
Service and Maintenance | Use the job time ticker to record the time you work on a task. Start this ticker when you arrive at the task location and begin working. If the task status is Planned, starting the ticker changes it to In progress. The related work order line status in D365 F&SCM also changes to In progress. When you stop the job time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Use time ticker to record working time |
Service and Maintenance | Use the job time ticker to record the time you work on a task. Use this time ticker if you are at the task location and start working on the task. When you start the job time ticker, and the task status is 'Planned', the task status is set to 'In progress'. Also the related work order line status in D365 FO is set to 'In progress'. When you end the job time ticker:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
User MOA parameters to bulk update lines |
Rental and Sales | After querying in all rental order lines necessary for the bulk update, review and ensure all lines are correct. Now the bulk update must be applied. Use the ''Update parameters'' to apply the bulk update across all lines in the journal. This will not yet apply the update to the rental order lines on order, but only keep them in this journal until final review and Process confirmed. All updates can be seen and tracked from old to new on the lines of the journal. Within the ''Update parameters'' system gives the options to:
In this example, system will apply a 10% percentage based price increase across all lines within the MOA journal, with an effective from date, and no effective to date. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Validate consumption price line |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Validate meter assignment on consumption price line |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Validate that relevant CBB price on rental line |
Rental and Sales | |||||||||||||||||||||||||||||||||||||||||||||||
|
Validate the On-hand quantity (purchased and produced) |
Finance | |||||||||||||||||||||||||||||||||||||||||||||||
|
View and register object meter values |
Service and Maintenance | For an object, meters can be set up in D365 FO. In the DynaRent Mobile app, for each meter, you can view the latest registered value. You can also register a new meter value. When you confirm a new meter value:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
View and register object meter values |
Service and Maintenance | You can view and register meter values for an object using the Rental Management mobile app. The app shows for each meter:
When you confirm a new value:
Note: If you are offline, the transaction is created after synchronization with D365 F&SCM. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View customer information |
Service and Maintenance | You can view the name and contact details of the customer for whom you do a task. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View customer information |
Service and Maintenance | You can view the customer’s name and contact details for your current task. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View maintenance history of object |
Service and Maintenance | You can view the maintenance history of an object. This history includes all previous maintenance tasks performed on the object. To access it in D365 F&SCM:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
View maintenance history of object |
Service and Maintenance | You can view the maintenance history of the object. The maintenance history shows the past maintenance tasks for the object. In the maintenance history, the maintenance history records are shown that exist for the object in D365 FO. You can find the maintenance history in D365 FO on the Business objects page, Action Pane, Maintenance tab, Inquiries group, Maintenance history. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object attachments |
Service and Maintenance | You can view the attachments of an object. In D365 FO, you can add attachments to a business object. These attachments are shown in the DynaRent Mobile app. Note: Only attachments of type URL are supported by the DynaRent Mobile app. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object attachments |
Service and Maintenance | You can view attachments linked to a business object. In D365 F&SCM, attachments can be added to a business object. These attachments appear in the Rental Management Mobile app. Note: Only attachments of type URL are supported in the mobile app. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object details |
Service and Maintenance | You can view detailed information about objects linked to your scheduled tasks. You can access object details from these pages:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
View object details |
Service and Maintenance | You can view the detailed information of the objects that are related to your scheduled tasks. You can view object details from several pages:
This topic explains how to view object details from the home page. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object information |
Service and Maintenance | You can view some general information about the object. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object information |
Service and Maintenance | You can view general information about a business object. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object location |
Service and Maintenance | You can view the current location of a business object. The location is shown on a map along with the address. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View object location |
Service and Maintenance | You can view the current location of the object. The object location is shown on a map and also the location address is shown. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View recall work order |
Service and Maintenance | You can view work orders created from a confirmed recall plan. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View rental information of object |
Service and Maintenance | In the DynaRent Mobile app, you can view the rental history of an object. The rental history shows to which customers the object was rented and when it was rented. The rental history is sorted from latest to older. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View rental information of object |
Service and Maintenance | You can view an object’s rental history in the Rental Management Mobile app. The history shows which customers rented the object and when. It is sorted from most recent to oldest. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View task attachments |
Service and Maintenance | You can view attachments linked to a task. In D365 F&SCM, attachments can be added to a work order line. These attachments appear in the Rental Management Mobile app. Note: Only attachments of type URL are supported in the mobile app. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View task attachments |
Service and Maintenance | You can view the attachments of a task. In D365 FO, you can add attachments to a work order line. These attachments are shown on the DynaRent Mobile app. Note: Only attachments of type URL are supported by the DynaRent Mobile app. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View task details |
Service and Maintenance | You can view general information about a task:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
View task details |
Service and Maintenance | You can view the general task information:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
View task location |
Service and Maintenance | You can view the location where the task must be done. The task location is shown on a map and also the location address is shown. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View task location |
Service and Maintenance | You can view the location where the task must be performed. The location is shown on a map along with the address. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View upcoming maintenance for the object |
Service and Maintenance | You can view upcoming maintenance tasks for a business object in the Rental Management Mobile app. Only maintenance tasks based on the applicable maintenance plans are shown. Other scheduled tasks are not included. |
||||||||||||||||||||||||||||||||||||||||||||||
|
View upcoming maintenance for the object |
Service and Maintenance | Based on the maintenance plans, as defined for an object in D365 FO, upcoming maintenance on the object is known. You can view the upcoming maintenance in the DynaRent Mobile app. So, the upcoming maintenance as shown is only based on the applicable maintenance plans. So, no other scheduled tasks on the object are shown. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Work order information & attachments work order |
Service and Maintenance | Many actions can be taken and information found from the action pane of the work order:
Attachments can be added to the work order through the standard attachments icon found on the navigation bar.
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Work order information & attachments work order |
Service and Maintenance |
You can access several actions and related information for a work order from the action pane:
You can add attachments to the work order using the Attachments icon on the navigation bar. |
||||||||||||||||||||||||||||||||||||||||||||||
|
Work order line tab for other functions |
Service and Maintenance |
You can perform several actions from the work order line tab:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Work order line tab for other functions |
Service and Maintenance | On the work order line tab, there are various actions that can be taken:
|
||||||||||||||||||||||||||||||||||||||||||||||
|
Work order template linked to item on Purchase order |
Purchasing |
You can automatically add a work order template to the purchase order header. This creates a work order with tasks based on the template setup, such as receival tasks with checklists. You can also default a work order template on a purchase order line. This is linked to the item through the default order settings on the item record. |