Set up Rental Management and Project Control Suite integration

Prev Next

Set up STAEDEAN Rental Management and Project Control Suite so that you can plan project rental quotations in the Advanced WBS. The setup is done once, usually by an administrator.

Licenses and configuration key

The integration requires three licenses:

  • STAEDEAN Rental Management

  • Project Control Suite

  • The separate license for the STAEDEAN Rental Management and Project Control Suite integration

Project Control Suite runs inside STAEDEAN Rental Management. With the licenses in place, enable the STAEDEAN Rental PCS integration configuration key. The configuration key makes the integration available on the project rental quotation.

Project Control Suite setup

All Project Control Suite setup applies as-is to the non-rental part of the Advanced WBS. The entry point for the Project Control Suite setup is Setting up and maintaining Project Control Suite.

Project Control Suite parameters

These parameters affect how project rental quotations behave:

  • Default project type (General tab): The default project type of the root project line in the Advanced WBS. A rental project is a time and material project, so set it to Time and material.

  • Auto scheduling (General tab): The default for new project rental quotations. Setting it to No is recommended, because rental items in one task often need different end dates. You can turn auto scheduling on or off for a single quotation at any time.

  • Show WBS with units and quantities (Display options tab): The default for new project rental quotations. Set it to Yes if new quotations are usually planned in the Advanced WBS. On the quotation, you can only change it when you create the quotation.

  • Use progress billing (Progress billing tab): The default for the project lines in the Advanced WBS. Set it to Yes if you usually invoice rental projects with progress bills. You can change it per project line.

See Set Project Control Suite parameters.

Other Project Control Suite setup

The following Project Control Suite setup is also relevant for the integration:

  • Cost codes, to review costs and revenues by cost code, including the rental lines. See Set up cost codes.

  • Project pricing, for the non-rental lines such as hours, fees, expenses, and sales items. Rental lines are priced by the rental agreement. See Set up project pricing.

  • Progress billing, only if you invoice rental projects with progress bills. See Set up progress billing.

  • Calculation, only if you use progress billing. See Set up calculation.

  • Open in Excel, only if you want to open the Advanced WBS in Excel. See Open the WBS in Excel from the Advanced WBS. In the Project Control Suite - Integration parameters, the Use flat numbering for consecutive projects via Excel integration field defines whether consecutive project rows from Excel become subprojects at the same level or are nested.

Note

Activity templates, construction templates, project inventory, and subcontract management are not needed for rental items. You only need them if you use them for the non-rental part of the Advanced WBS.

Rental Management setup

Rental parameters

In the Rental parameters, on the Finance tab, the Rental projects group has two fields for the integration.

The Transfer rental order to project field makes Transfer to project available on rental orders. Set it to Yes if you invoice rental projects with progress bills. With Transfer to project, the rental costs of the delivered rental order lines are posted to the project. For more information, see Invoice rental project and Use progress billing for project rental.

The Transfer sales lines to project rental order field defines where the sales items of the Advanced WBS go when you transfer the quotation. Options:

  • Yes: The sales items become sales lines on the rental order.

  • No: The sales items become lines of a separate sales order.

Rental agreements and component prices

Rental lines in the Advanced WBS are priced by rental agreements, as on a rental order.

A rental type can have several component prices on a rental agreement, for example a crane and its driver, or a weekday and a weekend rate. In that case, the price of the component with the WBS check box selected is used in the Advanced WBS. See Define the rental agreement specifics.