Validate a Staging Journal

Prev Next

Use this task to validate PLM data in a staging journal. Validation checks key fields such as Scenario, Interface status, Item ID, and Version ID for processing accuracy.

Steps

  1. Go to Modules > Engineering change management > Periodic > PLM Integration > Staging journal.

  2. Select the journal to validate.

  3. Review the following fields before validation:

    • Item ID

    • Version ID

    • Scenario

    • Interface status

    • Journal status (must be Open)

  4. Select Validate journal.

  5. Review validation messages.

  6. Correct errors if needed and repeat validation.