You can use PTC Windchill to create parts and to change parts. When finished, you can send new parts and change notices to a distribution target to be picked up by D365 FO for further processing.
This section explains how to send a new part or a change notice on an existing part to a distribution target as defined in PTC Windchill.
Before you can send part data, make sure the applicable distribution target is associated to the part.
Name | Responsible | Description |
---|---|---|
Check associated distribution target |
Engineer |
You can check if the correct distribution target is associated with a part. This is required to be able to send the data to D365 FO. Note: The steps and user interface can differ in your PTC Windchill version. |
Associate distribution target to part |
Engineer |
Before you send data to a distribution target, make sure the applicable distribution target is associated with the part. A distribution target is a combination of a location and formatting rules to which PTC Windchill data is sent. D365 FO takes the PTC Windchill data from this location for further processing in D365 FO. Note: The steps and user interface can differ in your PTC Windchill version. This topic describes the manual procedure. For other ways to associate distribution targets to parts, consult your PTC Windchill partner. |
Send part to distribution target |
Engineer |
If you have created a new part in PTC Windchill, send it to a distribution target. So, D365 FO can take the part data from this location for further processing in D365 FO.
For more information, refer to ESI Send to distribution target
.
Note:
The steps and user interface can differ in your PTC Windchill version. This topic describes the manual procedure. For other ways to send part data to distribution targets, consult your PTC Windchill partner.
|
Create change notice in PTC Windchill |
Engineering manager |
You can create a change notice to manage the changes to be applied to parts. In this example, one part is revised within a change notice. However, multiple parts could be changed within a change notice and also any other changes could be covered by a change notice. Note: The steps and user interface can differ in your version of PTC Windchill. This topic describes the manual procedure. For other ways to send change notices, consult your PTC Windchill partner. |
Complete change notice task in PTC Windchill |
Engineer |
You can complete the tasks of a change notice. By doing so, you indicate in the workflow that the required changes from the change notice are applied and ready for review. Note: The steps and user interface can differ in your version of PTC Windchill. This topic describes the manual procedure. For other ways to send change notices, consult your PTC Windchill partner. |
Review change notice in PTC Windchill |
Engineering manager |
You can review changes made to a part by the instructions of a change notice. By doing so you approve the changes applied by the engineer. Note: The steps and user interface can differ in your version of PTC Windchill. This topic describes the manual procedure. For other ways to send change notices, consult your PTC Windchill partner. |
Audit change notice in PTC Windchill. |
Engineering manager |
You can audit a change notice in PTC Windchill. By doing so you approve the sending of the parts of the change notice to the distribution target. Note: The steps and user interface can differ in your version of PTC Windchill. This topic describes the manual procedure. For other ways to send change notices, consult your PTC Windchill partner. |