If you have recorded a procedure activity for a scenario, the steps of the procedure activity cover several activities of the related flow. You can link procedure activity steps to the relevant flow activities. You can also link procedure activity steps to existing or new activities. You can also add procedure activity steps to a sub activity or replace the sub activity steps with procedure activity steps.
Name | Responsible | Description |
---|---|---|
Link flow activity to procedure activity steps |
Solution designer |
If you have recorded a procedure activity for a scenario, the steps of the procedure activity cover several activities of the related flow. You can link procedure activity steps to the relevant flow activities. As a result, on the Preview tab, the linked flow activities are highlighted in the flow. So, you see the route of the scenario through the flow.
|
Link activity to procedure activity steps |
Solution designer |
If you have recorded a procedure activity, the steps of the procedure activity can cover several activities. You can link an existing activity to the selected procedure activity steps. |
Create activity and link it to procedure activity steps |
Solution designer |
If you have recorded a procedure activity, the steps of the procedure activity can cover several activities. You can create a new activity and link it to the selected procedure activity steps. |
Copy activity and link copy to procedure activity steps |
Solution designer |
If you have recorded a procedure activity, the steps of the procedure activity can cover several activities. You can copy an existing activity and link the copy to the selected procedure activity steps. |
Add procedure activity steps to activity steps |
Solution designer |
You can add procedure activity steps to another activity. A common scenario is that you add procedure activity steps to the sub activity that is linked to these steps. If the other activity:
|
Replace activity steps with procedure activity steps |
Solution designer |
You can replace the steps of another activity with procedure activity steps. As a result, the existing activity steps are deleted and replaced with the selected procedure activity steps. A common scenario is that you replace the steps of the sub activity that is linked to the selected procedure activity steps. You can not replace steps of activities with:
|
Name | Responsible | Description |
---|---|---|
Link flow activity to procedure activity steps |
Solution designer |
If you have recorded a procedure activity for a scenario, the steps of the procedure activity cover several activities of the related flow. You can link procedure activity steps to the relevant flow activities. As a result, on the Preview tab, the linked flow activities are highlighted in the flow. So, you see the route of the scenario through the flow.
|
Link activity to procedure activity steps |
Solution designer |
If you have recorded a procedure activity, the steps of the procedure activity can cover several activities. You can link an existing activity to the selected procedure activity steps. |
Create activity and link it to procedure activity steps |
Solution designer |
If you have recorded a procedure activity, the steps of the procedure activity can cover several activities. You can create a new activity and link it to the selected procedure activity steps. |
Copy activity and link copy to procedure activity steps |
Solution designer |
If you have recorded a procedure activity, the steps of the procedure activity can cover several activities. You can copy an existing activity and link the copy to the selected procedure activity steps. |
Add procedure activity steps to activity steps |
Solution designer |
You can add procedure activity steps to another activity. A common scenario is that you add procedure activity steps to the sub activity that is linked to these steps. If the other activity:
|
Replace activity steps with procedure activity steps |
Solution designer |
You can replace the steps of another activity with procedure activity steps. As a result, the existing activity steps are deleted and replaced with the selected procedure activity steps. A common scenario is that you replace the steps of the sub activity that is linked to the selected procedure activity steps. You can not replace steps of activities with:
|
Related to | Notes |
---|---|
Link sub activities to procedure activity steps |
  |