Post release staging journals

Prev Next

Post staging journals created with the Import release scenario.

Note

Confirm that release parameters (Target company, Max levels) are set correctly before execution.

  1. Go to Modules > Engineering change management > Periodic > PLM integration > Post release staging journals

  2. Filter journals by:

    • Scenario as Import release

    • Status as Open

  3. Specify Number of threads and Max levels.

  4. Select OK. The system releases engineering data to logistical companies.