Use this process to post migration data from the PLM system into D365 F&SCM.
Steps
Go to Modules > Engineering change management > Periodic > PLM Integration > Post migration staging journals.
Use Filter and set:
Scenario = Import migration
Journal status = Open
(Optional) Increase Number of threads based on system capacity.
Run interactively or enable Batch processing.
Click OK.