Documentation Index

Fetch the complete documentation index at: https://docs.staedean.com/llms.txt

Use this file to discover all available pages before exploring further.

Configure Product release automation

Prev Next

Use this section to automatically release engineering products, BOMs, and routes from the PLM system to operational companies in D365 F&SCM. This automation reduces manual effort, ensures consistency, and provides full traceability.

Prerequisites

Before you configure this feature, ensure that:

  • A PLM system integration is set up.

  • At least one Engineering Change Category exists with a release policy.

  • Required product attributes are available.

  • You have access to the ECM workspace and PLM Systems setup.

  • Staging journals and ECOs are available.

  • Operational companies are configured.

A screenshot of a computer AI-generated content may be incorrect.

Automation setup

Field

Description

Active

Specifies whether product release automation is enabled.

  • Enabled (Yes): Product release automation runs automatically. Engineering products, BOMs, and routes are released from the PLM system to operational companies based on the defined setup.

  • Disabled (No): Product release automation is turned off. All releases must be performed manually, and no automated release processes are triggered.

Add engineering product category details

Adds a new engineering product category to the automation setup.

Remove engineering product category details

Removes the selected category from the automation setup.