Set up shown below is required for bid import.
| Name | Responsible | Description |
|---|---|---|
|
Initialize document templates |
Project manager |
The first step required to do the tender import is to initialize the document templates. This will load the default templates. |
|
Set up integration parameters |
Project manager |
Below listed are the parameters for tender import that are included as a part of the set up for APM.
|
| Name | Responsible | Description |
|---|---|---|
|
Initialize document templates |
Project manager |
The first step required to do the tender import is to initialize the document templates. This will load the default templates. |
|
Set up integration parameters |
Project manager |
Below listed are the parameters for tender import that are included as a part of the set up for APM.
|
| Related to | Notes |
|---|---|
|
Set up integration parameters |
  |
|
Set up bid import |
  |