Set up shown below is required for bid import.
Name | Responsible | Description |
---|---|---|
Initialize document templates |
Project manager |
The first step required to do the tender import is to initialize the document templates. This will load the default templates. |
Set up integration parameters |
Project manager |
Below listed are the parameters for tender import that are included as a part of the set up for APM.
|
Name | Responsible | Description |
---|---|---|
Initialize document templates |
Project manager |
The first step required to do the tender import is to initialize the document templates. This will load the default templates. |
Set up integration parameters |
Project manager |
Below listed are the parameters for tender import that are included as a part of the set up for APM.
|
Related to | Notes |
---|---|
Set up integration parameters |
  |
Set up bid import |
  |