An engineering change has an impact on operations and products. For each engineering change order, you can define the severity of the impact.
You can use severities to determine how severe the impact of a change is or can be based on the type of changes. So, appropriate measures can be taken to implement the changes as smoothly as possible.
In the Product engineering parameters, you define how the severity of an engineering change order is determined:
Name | Responsible | Description |
---|---|---|
Set up engineering change severities |
Product manager |
You can use severities to determine how severe the impact of a change on an engineering change order is or can be. For example, for high-impact changes, set the severity to "Very high" and for only a small change, set the severity to "Very low". You first set up the severities and then you set up the rule sets for these severities. A severity rule set defines how a severity is calculated based on the changes that are made with an engineering change order. Set up the severities that you can use to:
|
Set up engineering change severity rule sets |
Product manager |
You can use severities to determine how severe the impact of a change on an engineering change order is or can be. To (automatically) calculate the severity of an engineering change order, set up severity rule sets. For each severity rule set, define the rules that must be met to apply the related severity. You can add these rules to a severity rule set:
On (automatic) calculate, the severity rule sets are checked from top to bottom. The first severity rule set for which all defined rules are met determines the severity. Usually, you put the severity rule set with the most rules at the top, and the one with the least rules at the bottom of the list. Use the Up and Down buttons to define the sequence in which the severity rule sets are checked. Example:You have three rule sets: "High", "Medium" and "Low"
Scenario 1: An engineering change order has changes to the route, the BOM, and the document. On calculate, the severity is set to Medium. Scenario 2: An engineering change order has a change to the document. On calculate, the severity is set to Low. Scenario 3: An engineering change order has changes to route, BOM, document, attribute, and impact. On calculate, the severity is set to High. |
Name | Responsible | Description |
---|---|---|
Set up engineering change severities |
Product manager |
You can use severities to determine how severe the impact of a change on an engineering change order is or can be. For example, for high-impact changes, set the severity to "Very high" and for only a small change, set the severity to "Very low". You first set up the severities and then you set up the rule sets for these severities. A severity rule set defines how a severity is calculated based on the changes that are made with an engineering change order. Set up the severities that you can use to:
|
Set up engineering change severity rule sets |
Product manager |
You can use severities to determine how severe the impact of a change on an engineering change order is or can be. To (automatically) calculate the severity of an engineering change order, set up severity rule sets. For each severity rule set, define the rules that must be met to apply the related severity. You can add these rules to a severity rule set:
On (automatic) calculate, the severity rule sets are checked from top to bottom. The first severity rule set for which all defined rules are met determines the severity. Usually, you put the severity rule set with the most rules at the top, and the one with the least rules at the bottom of the list. Use the Up and Down buttons to define the sequence in which the severity rule sets are checked. Example:You have three rule sets: "High", "Medium" and "Low"
Scenario 1: An engineering change order has changes to the route, the BOM, and the document. On calculate, the severity is set to Medium. Scenario 2: An engineering change order has a change to the document. On calculate, the severity is set to Low. Scenario 3: An engineering change order has changes to route, BOM, document, attribute, and impact. On calculate, the severity is set to High. |