Before you start using Product engineering, set up the Product engineering parameters.
| Name | Responsible | Description | 
|---|---|---|
| Set up engineering version control parameters | Product manager | Define if it is allowed to use inactive or not-effective engineering versions on transactions. | 
| Set up engineering release control parameters | Product manager | Set up the release control parameters to define the behavior of releasing and receiving products. | 
| Set up engineering attribute search parameters | Product manager | Define if the on-hand inventory is shown in the product attribute search. | 
| Set up engineering change parameters | Product manager | To be able to work with engineering change management, this setup is required: 
 | 
| Define product engineering number sequences | Product manager | Define the number sequences that are used for: 
 | 
| Set up BOM number sequence | Product manager | If you use a staging journal to release products with a BOM, you cannot manually enter a BOM number. Therefore, a BOM number sequence is required in the engineering company to automatically number BOMs. | 
| Name | Responsible | Description | 
|---|---|---|
| Set up engineering version control parameters | Product manager | Define if it is allowed to use inactive or not-effective engineering versions on transactions. | 
| Set up engineering release control parameters | Product manager | Set up the release control parameters to define the behavior of releasing and receiving products. | 
| Set up engineering attribute search parameters | Product manager | Define if the on-hand inventory is shown in the product attribute search. | 
| Set up engineering change parameters | Product manager | To be able to work with engineering change management, this setup is required: 
 | 
| Define product engineering number sequences | Product manager | Define the number sequences that are used for: 
 | 
| Set up BOM number sequence | Product manager | If you use a staging journal to release products with a BOM, you cannot manually enter a BOM number. Therefore, a BOM number sequence is required in the engineering company to automatically number BOMs. | 
| Related to | Notes | 
|---|---|
| Set up product engineering parameters |   |