Forecast project

Prev Next

A project can be forecasted in two ways, these are either with or without a Work breakdown structure. The Work breakdown structure is used to estimate the costs, revenue and allocate resources to a project. If the no WBS is used, then the user must manually add the forecasted lines to a project. This flow describes both options.

Flow diagram