A project can be forecasted in two ways, these are either with or without a Work breakdown structure. The Work breakdown structure is used to estimate the costs, revenue and allocate resources to a project. If the no WBS is used, then the user must manually add the forecasted lines to a project. This flow describes both options.
Forecast project
New
- Updated on Mar 23, 2026
- Published on Mar 6, 2026
- 1 minute(s) read
Was this article helpful?