Forecast project

Prev Next

A project can be forecasted in two ways: with or without a work breakdown structure (WBS). The WBS is used to estimate the costs, revenue, and allocate resources to a project. If the no WBS is used, you must manually add the forecasted lines to a project. This flow diagram shows both options.

Flow diagram