Import files into the staging table

Prev Next

This scenario assumes that the engineering department works with a system that delivers files for changed products and bills of material (Windchill, Teamcenter). The file layout is either CSV or XML, and combinations of fields determine the type of change to be processed. The sequence of imports is important: to substitute an item with a new item, first import the new item before importing the substitute. The list below shows the supported transactions from the staging table with examples of the fields that the import file must provide.

Steps

Specific mapping rules:

  1. Items, when new items are created, the item information is completed based on a template set in the Engineering Change Management Setup.

  2. Item variants are supported, when specified, the system either creates a new variant or updates an existing one.

  3. Item substitutions are supported, when a Substitution Type and No. are specified, it is assumed that the dependent line is a new item for which a separate ECO is created. When processing the ECO, a check is made whether the new item exists. If not, an error requests the user to first process the ECO for the new item.

  4. When a Production BOM No. is specified, it is assumed that the Production BOM No. is the same as the parent item of the BOM. The lines that contain the Production BOM No. are then considered component lines and created with a line number.

  5. Based on the settings in the Engineering Change Management Setup, a BOM is either replaced or created as a new version. When Create BOM Version is checked, the new version is created with the revision code as the version number. The same method applies to the routing.

Import a new or changed item

Field

Example

Type

Item

No

1002

Variant Code

Description

New Bicycle

Description 2

Unit Of Measure Code

Project Control Suite

Class

Vendor No.

Vendor Name

Item Category Code

MISC

Import an item substitute

Field

Example

Type

Item

No

1000

Variant Code

Description

Bicycle

Description 2

Substituted

Unit Of Measure Code

Project Control Suite

Class

Vendor No.

Vendor Name

Item Category Code

MISC

Substitution By Type

Item

Substitution By No.

1002

Inter Changeable

Substitution Condition

Upgraded

Import a Bill of Material

Field

Example

Example

Type

Production BOM

Production BOM

No

1002

1100

Variant Code

Description

Bicycle New

Description 2

Unit Of Measure Code

Project Control Suite

Project Control Suite

Class

Vendor No.

Vendor Name

Production BOM No.

1002

Production BOM Version No.

1000-2

Production BOM Version Date

1-12-2015

Length

Width

Depth

Weight

Prod BOM No. Series

Prod BOM Version No.

Position

Position 2

Position 3

Lead Time Offset

Routing Link Code

Scrap

Calculation Formula

Quantity Per

1

Import a Routing

Field

Example

Example

Type

Routing

Routing

Routing Type

Serial

Routing No.

1002

Routing Version No.

Routing No. Series

Routing Version Nos.

Routing Operation No.

10

Routing Line Type

Work Center

Routing Line Type No.

100

Routing Work Centre

Routing Setup Time

80

Routing Run Time

10

Routing Wait Time

Routing Move Time

Routing Setup Time UOM Code

Routing Run Time UOM Code

Routing Wait Time UOM Code

Routing Move Time UOM Code

Routing Minimum Process Time

Routing Maximum Process Time

Routing Concurrent Capacities

Routing Send Ahead Quantity

1

Routing Routing Link Code

Routing Standard Task Code