--- title: "View translations in an engineering change order" slug: "view-translations-in-an-engineering-change-order" tags: ["Task"] updated: 2026-08-03T12:16:24Z published: 2026-08-03T12:16:24Z canonical: "docs.staedean.com/view-translations-in-an-engineering-change-order" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # View translations in an engineering change order The **Translations** tab on the ECO details screen lets an Engineering Change Manager review multilingual product data during change impact assessments and engineering approvals. Complete the following steps to review the translations for an engineering change order. ## Steps 1. Go to **Engineering change management** > **Common** > **Engineering change orders**. The **Engineering change orders** list page opens. 2. Locate the required engineering change order in the list. 3. Select the engineering change order number. The details page for the selected engineering change order opens. 4. Select the **Translations** tab. 5. Review the language code, translated part name, and translated part description for each affected part. > [!NOTE] > Note > > The **Translations** tab remains visible even when no staging journal is linked to the ECO, so you always have a consistent view of multilingual product information.