--- title: "Update the production BOM - Impact workspace" slug: "update-the-production-bom-impact-workspace" description: "Update your production BOM with the To version's BOM. Follow the steps to review, compare components, and ensure material availability before updating." tags: ["Task", "ECM plus"] status: "update" updated: 2026-10-21T07:00:03Z published: 2026-10-21T07:00:03Z canonical: "docs.staedean.com/update-the-production-bom-impact-workspace" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Update the production BOM - Impact workspace Use **Update BOM** to replace the production BOM with the BOM associated with the **To version**. ## Steps 1. Go to **Product information management > Engineering change management > Engineering change orders**. 2. Open a released ECO you want to review. 3. On the Action Pane, in the **Business impact** group, select **Open impact workspace**. The workspace opens for the selected ECO. > [!NOTE] > Note > > If the ECO has no lines yet, the button is unavailable. Add at least one affected product first. 4. In the **Production orders** section, locate the affected production order. 5. Select **Update BOM**. The **Update BOM** pane opens on the right. 6. Review the production order and item number. 7. In the **BOM ID** list, select the BOM associated with the **To version**. 8. Review the component comparison. The comparison identifies components that were added, removed, or changed. 9. Review the component availability information and any shortage warnings. 10. Select **Replace** to update the production BOM. To close the pane without updating the BOM, select **Cancel**. > [!NOTE] > Note > > - Updating the production BOM replaces its existing lines. Review the component comparison before you confirm the update. > - A component shortage warning doesn’t necessarily prevent the update. Review material availability before releasing the order. After the update is complete: - The production BOM lines are recreated from the selected BOM. - The **Action status** changes to **BOM updated**. - An entry is added to the **Change log**. For more information, see [Track actions in the change log](/manufacturing/docs/track-actions-in-the-change-log-impact-workspace). The workspace updates the production order with the selected engineering BOM before the order is released to production. ## Related - [Manage production order - Impact workspace](/manage-production-order-impact-workspace.md) - [Get to know impact workspace](/get-to-know-eco-impact-workspace.md)