--- title: "Set up project inventory" slug: "set-up-project-inventory" description: "Manage project-specific inventory effectively by activating the Project tracking dimension for precise tracking of high-value products." tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:28:31Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-up-project-inventory" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set up project inventory Use the **Project** tracking dimension to manage project-specific inventory. Activate this **Project** tracking dimension for the relevant tracking dimension groups. As a result, you can track project inventory through all transactions for the released products to which the tracking dimension group is assigned. The tracking is done in a similar way as for the **Serial number** and **Batch number** tracking dimensions. Usually, you set up project inventory tracking for high-value products that require project-specific sourcing. No project inventory tracking is required for products: - That are unique and are only used for a specific project. - That can easily be supplied; the products are always available in inventory or can be purchased or produced at short notice. ### Steps 1. Go to **Product information managemen**t > **Setup** > **Dimension and variant groups** > **Tracking dimension groups**. 2. Click **New**. 3. In the **Name** field, type a value. 4. In the **Description** field, type a value. 5. Click **Save**. 6. In the list, find and select the desired record. 7. Select the **Active** check box. 8. Select the **Blank receipt allowed** check box. 9. Select the **Blank issue allowed** check box. 10. Select the **Physical inventory** check box. 11. Select the **Coverage plan by dimension** check box. 12. Select the **For purchase prices** check box. 13. Select the **For sales prices** check box. > [!NOTE] > **Notes** > > Because the **Primary stocking** check box is cleared, you can still purchase, produce, or sell the products anonymously, if required. ## Related - [Setting up and maintaining Project Control Suite](/setting-up-and-maintaining-project-control-suite.md)