--- title: "Set up integration parameters" slug: "set-up-integration-parameters" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T13:09:45Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-up-integration-parameters" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set up integration parameters Below listed are the parameters for tender import that are included as a part of the set up for PCS. - **Calculation group for tender import**: Calculation group is used to convert the unit from the file into a scheduled unit. You need to make sure that all the units present in the tender import file are present as units in D365 F&SCM and must be mapped to a variable in the calculation group. - **Default category**: The category that is set up in the parameters will be flown into each transaction line by default and this can be changed too. ## Steps 1. Click **Advanced project management**. 2. Click **Advanced project management parameters**. 3. Click the **Integrations** tab. 4. Calculation group is used to convert the unit from the file into a scheduled unit. You need to make sure that all the units present in the tender import file are present as units in D365 F&SCM and must be mapped to a variable in the calculation group. In the **Calculation group for tender import** field, enter or select a value. 5. The category that is set up in the parameters is the default value in each transaction line and if intended, this can be changed too. In the **Default category** field, enter or select a value. 6. Click **Save**. 7. Close the page. ## Related - [Set up bid import](/set-up-bid-import.md) - [Set Project Control Suite parameters](/set-project-control-suite-parameters-flow.md)