--- title: "Set up cost codes" slug: "set-up-cost-codes" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:29:03Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-up-cost-codes" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set up cost codes Cost codes (or job codes) can be defined in the system to represent an internal or external code which is used to represent a fixed activity or cost category. Cost codes can be entered manually or can be imported using the standard Microsoft Dynamics AX tools or the Business Integration Solution (BIS). - Cost code can be based on an external standard or list. - Cost code can also represent an internal code which is used for reporting and analysis. - Cost code must be linked to a cost code standard. The combination of cost code and cost code standard is unique. ### Steps 1. Go to **Project management and accounting** > **Setup** > **Advanced project management** > **Cost code setup** > **Cost codes**. 2. Click **Cost codes**. 3. Click **New**. 4. In the **Cost code** field, type a value. 5. In the **Description field**, type a value. 6. In the **Cost code standard** field, enter or select a value. 7. In the **Cost code group** field, enter or select a value. 8. Close the page. ## Related - [Set up cost codes](/set-up-cost-codes-flow.md)