--- title: "Set up cost code standards" slug: "set-up-cost-code-standards" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:28:51Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-up-cost-code-standards" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set up cost code standards A cost code is always linked to a cost code standard. The combination of cost code and cost code standard must be unique. To each project quotation and related projects, one cost code standard can be linked. You can do so on the project quotation work breakdown structure root node. In a project quotation and the related projects, you can only use cost codes of the linked cost code standard. Cost code standards are, for example, provided by these organizations: - CSI (Construction Specifications Institute). - NAHB (National Association of Home Builders). ### Steps 1. Go to **Project management and accounting** > **Setup** > **Advanced project management** > **Cost code setup** > **Cost code standards**. 2. Click **Cost code** standards. 3. Click **New**. 4. In the **Cost code standard** field, type a value. 5. In the **Description** field, type a value. 6. Click **Save**. 7. Close the page. ## Related - [Set up cost codes](/set-up-cost-codes.md)