--- title: "Set up cost code groups" slug: "set-up-cost-code-groups" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:28:57Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-up-cost-code-groups" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set up cost code groups The number of cost codes in the system can be almost unlimited. However, for reporting or analysis it might be useful to group certain cost codes. For this purpose, a cost code group can be defined. - The use of cost code groups is mandatory - The combination of cost code group + cost code standard is unique - The cost code groups are mainly used for reporting and analysis to subtotal member codes ### Steps 1. Go to **Project management and accounting** > **Setup** > **Advanced project management** > **Cost code setup** > **Cost code group**. 2. Click **Cost code** group. 3. Click **New**. 4. In the **Cost code group** field, type a value. 5. In the **Description** field, type a value. 6. In the **Cost code standard** field, enter or select a value. 7. Click **Save**. 8. Close the page. ## Related - [Set up cost codes](/set-up-cost-codes.md)