The number of cost codes in the system can be almost unlimited.
However, for reporting or analysis it might be useful to group certain cost codes.
For this purpose, a cost code group can be defined.
The use of cost code groups is mandatory
The combination of cost code group + cost code standard is unique
The cost code groups are mainly used for reporting and analysis to subtotal member codes
Steps
Go to Project management and accounting > Setup > Advanced project management > Cost code setup > Cost code group.
Click Cost code group.
Click New.
In the Cost code group field, type a value.
In the Description field, type a value.
In the Cost code standard field, enter or select a value.
Click Save.
Close the page.