--- title: "Set Project Control Suite parameters" slug: "set-project-control-suite-parameters" description: "Set up Project Control Suite parameters, including project types, cost codes, and pricing priorities, to streamline your project management process." tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T13:09:52Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-project-control-suite-parameters" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set Project Control Suite parameters Before you can use Project Control Suite, define the **Project Control Suite parameters**. ### Steps 1. Go to **Project management and accounting** > **Setup** > **Advanced project management** > **Advanced project management parameters**. 1. Sub-task: General. 2. Define the default project type for project and sub-project lines in a project quotation work breakdown structure. In the **Default project type** field, select an option. 3. Define the default project group for project and sub-project lines in a project quotation work breakdown structure. In the **Default project group** field, enter or select a value. 4. Define the master plan with which the project logistics is synchronized. So, on the **Project logistics** page, only the results of this master plan are shown. In the **Plan** field, enter or select a value. 5. Define how applicable prices are searched for on a project quotation WBS. You can change this default setting for each project quotation. In the **Pricing priority** field, select an option. 6. Select **No** in the **Use advanced pricing** field. 7. Define the default cost code standard for your project quotations. In the **Default cost code standard** field, enter or select a value. 8. Define for which level cost codes can be defined: In the **Default cost code level** field, select an option. - **Activity**: You can define a cost code for each WBS line. All estimated-costs-and-revenue lines of a WBS line have the same cost code, which cannot be changed. - **Transaction**: You can define a cost code for each WBS line and for each estimated-costs-and-revenue line. So, estimated-costs-and-revenue lines of one WBS line can have different cost codes. 9. If set to **Yes**, by default, on the WBS, quantity validation is done based on the applied quantity type. You can change the default value for this parameter on the root node of the WBS. In the **Validate quantity** field, select an option. 10. Select choice for **Lock for editing** field. 11. Make selection for **Auto scheduling** field. 12. Make selection for the **Transfer to item requirement** field. 13. Make selection for **Rounding off total amounts** field. 2. In the **Equipment** field, type a value. 3. Sub-task: Display options. 1. Click the **Display options** tab. 2. In the **Project node** field, enter or select a value. 3. In the **Activity node** field, enter or select a value. 4. In the **Option/Alternative node** field, enter or select a value. 5. In the **Subcontract node** field, enter or select a value. 6. In the **Comparison color** field, enter or select a value. 7. In the **Indirect Cost Color** field, enter or select a value. 8. Select **No** in the **Show alternatives and options** field. 9. Select **No** in the **Show WBS with units and quantities** field. 4. Sub-task: WBS Cost Control. 1. Click the **WBS cost control** tab. 2. Select **Yes** in the **Use cost code** field. 3. In the **Default journal name** field, enter or select a value. 4. In the **Category** field, enter or select a value. 5. In the **Default journal name** field, enter or select a value. 6. In the **WBS budget period** field, select an option. 7. In the **Cost code budget period** field, select an option. 5. Sub-task: Project change order. 1. Click the **Project change order** tab. 2. In the **Pending forecast model** field, enter or select a value. 3. In the **Approved forecast model** field, enter or select a value. 6. Sub-task: Number sequences. 1. Click the **Number sequences** tab. 7. Close the page. ## Related - [Set Project Control Suite parameters](/set-project-control-suite-parameters-flow.md)