--- title: "Set default cost code standard and level" slug: "set-default-cost-code-standard-and-level" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:29:06Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/set-default-cost-code-standard-and-level" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Set default cost code standard and level If you want to use cost codes in your project quotations and projects, set the default cost code standard and default cost code level. You can change these defaults on a project quotation work breakdown structure. > [!NOTE] > **Note** > > If you change these settings on a project quotation work breakdown structure, and already cost codes are defined, these are lost. ### Steps 1. Go to **Project management and accounting** > **Setup** > **Advanced project management** > **Advanced project management parameters**. 2. Click **Advanced project management parameters**. 3. In the **Default cost code standard field**, enter or select a value. 4. Define the default cost code level: In the **Default cost code level** field, select an option. - **Activity**: You can define a cost code for each WBS line. All estimated-costs-and-revenue lines of a WBS line have the same cost code, which cannot be changed. - **Transaction**: You can define a cost code for each WBS line and for each estimated-costs-and-revenue line. So, estimated-costs-and-revenue lines of one WBS line can have different cost codes. 5. Click **Save**. 6. Close the page. ## Related - [Set up cost codes](/set-up-cost-codes.md)