--- title: "Schedule a kanban job - Impact workspace" slug: "schedule-a-kanban-job-impact-workspace" description: "Schedule kanban jobs in an Engineering Change Order by selecting a target planning period, work cell, and due-date setting in the impact workspace." tags: ["Task", "ECM plus"] status: "update" updated: 2026-10-21T07:27:15Z published: 2026-10-21T07:27:15Z canonical: "docs.staedean.com/schedule-a-kanban-job-impact-workspace" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Schedule a kanban job - Impact workspace The available planning periods and capacity are based on the production flow model and work-cell configuration. ## Steps 1. Go to **Product information management > Engineering change management > Engineering change orders**. 2. Open a released ECO you want to review. 3. On the Action Pane, in the **Business impact** group, select **Open impact workspace**. The workspace opens for the selected ECO. > [!NOTE] > Note > > If the ECO has no lines yet, the button is unavailable. Add at least one affected product first. 4. In the **Kanban jobs** section, locate the affected kanban job. 5. Select **Schedule**. The **Schedule** pane opens on the right. 6. Review the kanban ID, job status, item number, current planning period, quantity, due date, and production flow. 7. In the **Target planning period** field, select the period in which you want to schedule the job. 8. In the **Target work cell** field, select the work cell, if the field is editable. 9. Set **Preserve due date** to one of the following values: - **On:** Keeps the current due date - **Off:** Allows the system to recalculate the due date based on the scheduling result 10. Select **Confirm** to schedule the job. To close the pane without scheduling the job, select **Cancel**. After scheduling is complete: - The job is assigned to the selected planning period. - The **Action status** changes to **Rescheduled**. - An entry is added to the **Change log**. For more information, see [Track actions in the change log](/manufacturing/docs/track-actions-in-the-change-log-impact-workspace). ## Related - [Manage kanban jobs - Impact workspace](/manage-kanban-jobs-impact-workspace.md) - [Get to know impact workspace](/get-to-know-eco-impact-workspace.md)