--- title: "Review cost value, bid value, and margin by cost code" slug: "review-cost-value-bid-value-and-margin-by-cost-code" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:39:40Z published: 2026-03-20T17:46:03Z canonical: "docs.staedean.com/review-cost-value-bid-value-and-margin-by-cost-code" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Review cost value, bid value, and margin by cost code If you use cost codes, for each project quotation, you can review the cost value, bid value, and margin by cost code. ### Steps 1. Click **Advanced project management**. 2. Click **Project quotation**. 3. In the list, find and select the desired record. 4. Click **Advanced WBS**. 5. Click **Edit**. 6. Select the root node to view the cost value, bid value, and margin by cost code for the full WBS hierarchy. 7. Click the **Cost codes** tab. 8. Select **Yes** in the **Revenue** field. 9. Select **Yes** in the **Cost** field. 10. Click **Refresh**. ## Related - [Use cost codes in work breakdown structure](/use-cost-codes-in-work-breakdown-structure.md)