--- title: "Revert a kanban job status - Impact workspace" slug: "revert-a-kanban-job-status-impact-workspace" description: "Learn how to use Revert status in an engineering change order to return a kanban job to an allowed earlier status and update its change log." tags: ["Task", "ECM plus"] status: "update" updated: 2026-10-21T07:28:14Z published: 2026-10-21T07:28:14Z canonical: "docs.staedean.com/revert-a-kanban-job-status-impact-workspace" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Revert a kanban job status - Impact workspace Use **Revert status** to return a kanban job to an allowed earlier status. For example, you might return a job from **Prepared** to **Planned** when it requires further planning. ## Steps 1. Go to **Product information management > Engineering change management > Engineering change orders**. 2. Open a released ECO you want to review. 3. On the Action Pane, in the **Business impact** group, select **Open impact workspace**. The workspace opens for the selected ECO. > [!NOTE] > Note > > If the ECO has no lines yet, the button is unavailable. Add at least one affected product first. 4. In the **Kanban jobs** section, locate the affected kanban job. 5. Select **Revert status**. The **Revert status** pane opens on the right. 6. Review the kanban ID, current status, item number, status date and time, and quantity. 7. In the **Status transition** field, select an available previous status. Available transitions depend on the current job status. 8. Review the warning about how the status change affects job preparation and scheduling. 9. Select **Confirm** to revert the status. To close the pane without changing the status, select **Cancel**. After the status is reverted: - The kanban job changes to the selected status. - The **Action status** changes to **Reverted**. - An entry is added to the **Change log**. For more information, see [Track actions in the change log](/manufacturing/docs/track-actions-in-the-change-log-impact-workspace). ## Related - [Manage kanban jobs - Impact workspace](/manage-kanban-jobs-impact-workspace.md) - [Get to know impact workspace](/get-to-know-eco-impact-workspace.md)