--- title: "Release parent items with BOMs and routes" slug: "release-parent-items-with-boms-and-routes" tags: ["Task", "PLM"] updated: 2026-03-26T14:45:59Z published: 2026-03-26T14:45:59Z canonical: "docs.staedean.com/release-parent-items-with-boms-and-routes" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Release parent items with BOMs and routes Release BOM and routing structures to logistical companies while minimizing database deadlocks. > [!NOTE] > Note > > - Add only parent items to the staging journal. Do not include BOM lines or routes. > - Verify that engineering versions and BOMs are set to **Active**. > - Disable **Run BOM check** in both engineering and logistical companies. > - Avoid parallel posting to the same target company. > - Set **Max levels** based on the required BOM levels. ### **Steps** 1. Import parent items into a staging journal with the **Import release** scenario. 2. Specify the **Target company**. 3. Run **Post release staging journals**. The system releases BOM and routing structures through parent item releases.