Release parent items with BOMs and routes

Prev Next

Release BOM and routing structures to logistical companies while minimizing database deadlocks.

Note

  • Add only parent items to the staging journal. Do not include BOM lines or routes.

  • Verify that engineering versions and BOMs are set to Active.

  • Disable Run BOM check in both engineering and logistical companies.

  • Avoid parallel posting to the same target company.

  • Set Max levels based on the required BOM levels.

Steps

  1. Import parent items into a staging journal with the Import release scenario.

  2. Specify the Target company.

  3. Run Post release staging journals. The system releases BOM and routing structures through parent item releases.