--- title: "Release 10.0.46.22 (October 2026)" slug: "release-10-0-46-22-october-2026-pcs-am" description: "Explore 10.0.46.22 for Project Control Suite - Asset Management, featuring project dimensions on labels, Excel WBS tools, improved WBS IDs, and bug fixes." tags: ["PCS-AM", "Release notes"] status: "new" updated: 2026-11-04T06:43:35Z published: 2026-11-04T06:43:35Z canonical: "docs.staedean.com/release-10-0-46-22-october-2026-pcs-am" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Release 10.0.46.22 (October 2026) Find information on the 10.0.46.22 (October 2026) release of Project Control Suite - Asset Management (PCS-AM). Version information: | Product | Version | Minimum version | Latest validated version | Planned next | | --- | --- | --- | --- | --- | | Project Control Suite - Asset Management | 10.0.46.22 | D365 F&SCM 10.0.46 | D365 F&SCM 10.0.49 | On demand | ## What’s new New or changed features in release 10.0.46.22 (October 2026) - Project Control Suite - Asset Management (PCS-AM). ### 1. Project inventory dimension on document routing label layouts The **Project** inventory dimension is now available as a field in the document routing label layouts. Before this release, you could print standard inventory dimensions such as **Site**, **Warehouse**, **Batch number**, and **Serial number**. The project dimension was missing from the layout field list. You can now print the project reference on product labels, shipping labels, and license plate labels. All label types use the same document routing layout. The D365 F&SCM web client and the Warehouse Management mobile app also use the same layout. So, the project dimension is available on every label type and print channel. **Key capabilities:** - Add the **Project** inventory dimension to a label layout on the **Document routing layout** page. - Print the project dimension on product labels during material registration, from the **Batches** and **Sub batches** pages, and at manufacturing order start. - Print the project dimension on shipping labels when you close a container or reprint them from the **Containers** page. - Print the project dimension on license plate labels from the **License plates** page, during purchase order receipt, and during work execution on the mobile device. - Keep existing label layouts unchanged. Layouts that do not reference the project dimension work like before. > [!NOTE] > Note > > The label layout data source must include the inventory dimensions table. Transactions without a project inventory reference print a blank value for the project dimension. ### 2. Open in Excel on the Advanced WBS pages The **Open in Excel** function on the **Advanced WBS** pages now works consistently. Before this release, the button on the committed view of a project quotation did nothing. The committed view and the edit view also showed a different set of Excel templates. **Key capabilities:** - Open the WBS of a project quotation in Excel from both the **Advanced WBS** page and the **Advanced WBS edit** page. - Select from the same relevant Excel templates on both project quotation pages. - Open the WBS of a project in Excel from the **Advanced WBS edit** page. The **Open in Excel** button is no longer shown on the committed **Advanced WBS** page for projects. See also: [Open the WBS in Excel from the Advanced WBS](/manufacturing/docs/open-the-wbs-in-excel-from-the-advanced-wbs) ### 3. WBS ID generation for project nodes imported from Excel The WBS ID generation for project nodes imported through Excel integration is improved. Before this release, project nodes at the same level were created as nested projects, one under the other. The system now assigns each project node its own WBS ID, based on its position in the Excel structure. **Key capabilities:** - Create several project nodes at the same level in Excel. Each node gets a separate WBS ID when you publish. - Keep activities nested under their parent project node, like before. - Build the full WBS of a project quotation in Excel with the **Generate WBS ID** parameter turned on in the **Project Control Suite** section of the quotation header. See also: [Generate WBS IDs when you publish the WBS from Excel](/manufacturing/docs/generate-wbs-ids-when-you-publish-the-wbs-from-excel) ## Bug fixes Bug fixes in release 10.0.46.22 (October 2026) - Project Control Suite - Asset Management (PCS-AM). | Bug ID | Title | Description | | --- | --- | --- | | 249727 | Lines refreshed and hidden after changing dates in Advanced WBS edit | In the **Advanced WBS edit** form, adding a sub-project with tasks and then changing a task end date refreshed all lines on the page. After the refresh, only the edited task line remained visible, and the rest of the project structure disappeared from view. You now can change task dates without triggering a refresh, and all lines remain visible. | | 240983 | Posting project invoice with payment retention throws an error | For a project with a payment retention percentage set on the project header and subproject, entering progress on a progress bill calculated the retained amount correctly. When you posted the automatically created project invoice proposal, the system threw an error instead of posting the invoice. You can now post project invoices with payment retention without errors, and the retained amount is included after posting. | | 247463 (CS00240660) | Filter in Advanced WBS quotation is removed after one change | In the **Advanced WBS** view for project quotations, filtering lines by project type showed only the project nodes. After you changed a field, such as a project description, and moved to the next line, the system removed the filter and expanded the full work breakdown structure again. The filter now stays active after you make a change, so you do not need to reapply it. | ## Related - [Release 10.0.45.21 (February 2026)](/release-1004521-february-2026.md)