--- title: "Prices on project quotation work breakdown structure" slug: "prices-on-project-quotation-work-breakdown-structure" description: "Learn how to set pricing priorities for project quotations using WBS, including options for quotation statements and project price setups." tags: ["Concept", "Project Control Suite", "PCS"] updated: 2026-03-20T09:05:05Z published: 2026-03-20T17:45:57Z canonical: "docs.staedean.com/prices-on-project-quotation-work-breakdown-structure" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Prices on project quotation work breakdown structure How applicable prices are searched for on a project quotation WBS is defined by the **Pricing priority** parameter. You can select one of these options: - **Quotation statement** - **Project price setup** On the **Project Control Suite parameters**, you define the default value for this parameter. For each project quotation, you can change the default value of this parameter. The price search is done on creation of a project quotation estimate line. An estimate line can be created in these ways: - On selection of an activity ID on a new task. - On save of a new task without an activity ID defined. - Manually add an estimate line. - On import of a WBS template. If you import a template, you can choose to use the prices as defined on the template estimate lines or apply the price search. ### Quotation statement If the pricing priority is set to **Quotation statement**, the applicable price is searched for in this sequence: Search for the applicable category price in the quotation statement. If, for a category, no price is defined in the quotation statement, search for the applicable category price in the project price setup. ### Project price setup If the pricing priority is set to **Project price setup**, the applicable price is searched for in this sequence: 1. Search in the quotation statement for an applicable category price for which the **Manual override** check box is selected. Manual override means that a project-quotation-specific price is defined for the category. Only those category prices are used, for which the **Manual override** check box is selected. 2. Search for all other applicable category prices in the project price setup. ## Related - [Set Project Control Suite parameters](/set-project-control-suite-parameters.md) - [Define project quotation price](/define-project-quotation-price.md)