--- title: "Posting a PLM Staging Journal" slug: "posting-a-plm-staging-journal" tags: ["Task", "PLM"] updated: 2026-06-25T06:14:30Z published: 2026-06-25T06:14:30Z canonical: "docs.staedean.com/posting-a-plm-staging-journal" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Posting a PLM Staging Journal Posting transfers validated PLM data into live D365 F&SCM tables by creating or updating engineering products and engineering change orders (ECOs). There are two types of posting: - Manual Posting - Batch Posting Open Journals **Manual Posting** Manual posting allows users to process individual staging journals on demand. 1. Go to **Engineering Change Management > Periodic > PLM Integration > Staging Journal**. 2. Select the journal to be processed. 3. Click **Post journal**. ![Post journal.png](https://cdn.document360.io/da662430-6a41-47b1-8c7e-7e4ac37a9756/Images/Documentation/Post%20journal.png) > [!NOTE] > Note > > Manual posting is typically used for testing, validation, or controlled processing of specific journals. **Batch Posting of Open Journals.** Batch posting enables processing of multiple open journals simultaneously, either immediately or through scheduled jobs. 1. Go to **Engineering Change Management > Periodic > PLM Integration > Post Staging Journals**. 2. Configure the parameters and click **OK**. 3. Select **Run in the background** to schedule recurring automatic posting. 4. (Optional) Specify the number of threads to enable parallel posting in high-volume environments. ![Posting journal.png](https://cdn.document360.io/da662430-6a41-47b1-8c7e-7e4ac37a9756/Images/Documentation/Posting%20journal.png) **Results of Posting** - If posting succeeds, the integration automatically creates the associated structures based on scenario (ImportPart, ImportECO, ImportMigration, and ImportRelease) - After posting, the data is managed through standard D365 F&SCM and [Engineering Change Management](https://learn.microsoft.com/en-us/dynamics365/supply-chain/engineering-change-management/product-engineering-overview) processes, including: - Product release - Readiness checks - Change order approval - Version control