--- title: "Generate WBS IDs when you publish the WBS from Excel" slug: "generate-wbs-ids-when-you-publish-the-wbs-from-excel" description: "Generate WBS IDs automatically in Microsoft Excel with Project Control Suite by configuring project quotations and flat numbering for consecutive projects." tags: ["PCS", "Project Control Suite", "Task"] status: "new" updated: 2026-10-30T09:59:42Z published: 2026-10-30T09:59:42Z canonical: "docs.staedean.com/generate-wbs-ids-when-you-publish-the-wbs-from-excel" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Generate WBS IDs when you publish the WBS from Excel When you build a work breakdown structure (WBS) of a project quotation in Microsoft Excel, Project Control Suite can generate the WBS IDs for you. Set **Generate WBS ID** on the project quotation. When you publish the WBS from Excel, the rows are then numbered automatically. The Excel template uses the line type of each row: - **Project**: A project node is created with its own WBS ID. - **Activity**: An activity is created under its parent project and numbered within that project. How consecutive project rows are numbered depends on the **Use flat numbering for consecutive projects via Excel integration** parameter: - **Yes**: Consecutive project rows are numbered at the same level, as separate project nodes. - **No**: Each project row is created under the previous project row. This is the behavior of earlier versions, kept for existing implementations. Example for a project with three sub-projects: | Row | Use flat numbering for consecutive projects via Excel integration = Yes | Use flat numbering for consecutive projects via Excel integration = No | | --- | --- | --- | | Project | 1 | 1 | | Sub project A1 | 2 | 1.1 | | Sub project A2 | 3 | 1.1.1 | | Sub project A3 | 4 | 1.1.1.1 | ## Prerequisites - The bid import is set up and a bid import template is available. See [Initialize document templates](/manufacturing/docs/initialize-document-templates) and [Set up integration parameters](/manufacturing/docs/set-up-integration-parameters). - The **Use flat numbering for consecutive projects via Excel integration** parameter is set. See [Set up integration parameters](/manufacturing/docs/set-up-integration-parameters). ## Steps 1. Click **Advanced project management**. 2. Click **Project quotation**. 3. In the list, find and select the desired record. 4. On the **Project Control Suite** FastTab of the quotation header, set **Generate WBS ID** to **Yes**. 5. Click **Save**. 6. Open the WBS in Excel. See [Open the WBS in Excel from the Advanced WBS](/manufacturing/docs/open-the-wbs-in-excel-from-the-advanced-wbs). 7. In the Excel file, add a row for each project and each activity. In the line type column, select **Project** or **Activity**. 8. In the **Microsoft Excel add-in** pane, click **Publish**. 9. Click **Advanced WBS** and check the generated WBS IDs. The WBS is published to the **Advanced WBS**. The WBS IDs are generated based on the **Use flat numbering for consecutive projects via Excel integration** setting. > [!NOTE] > **Notes** > > - If **Generate WBS ID** is set to **No**, you must enter the WBS IDs in the Excel file. > - If the project nodes are nested under each other, check the **Use flat numbering for consecutive projects via Excel integration** parameter. ## Related - [Open the WBS in Excel from the Advanced WBS](/open-the-wbs-in-excel-from-the-advanced-wbs.md)