--- title: "Define project setup" slug: "define-project-setup" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:39:45Z published: 2026-03-20T17:46:03Z canonical: "docs.staedean.com/define-project-setup" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Define project setup On the project quotation work breakdown structure, you can define the project setup: - **For the root project line** - You can change the default project type and project group as retrieved from the **Project Control Suite parameters**. Before you transfer the project quotation to a project, you must at least define a project contract for the root project line. - **Optionally, for other project lines** - If specific project setup is required, you can override the project setup as inherited from the root project line. ### Steps 1. Click **Advanced project management**. 2. Click **Project quotation**. 3. In the list, find and select the desired record. 4. In the list, click the link in the selected row. 5. Click **Advanced WBS**. 6. Click **Edit**. 7. Select a project node. Click the **Setup** tab. 8. You can change the project type. In the **Project type** field, select an option. 9. You can change the project group. In the **Project group** field, enter or select a value. 10. You can create a new project contract or use an existing project contract. To create a new project contract, click the plus button. In the **Project contract ID** field, enter or select a value. ## Related - [Create work breakdown structure](/create-work-breakdown-structure.md)