--- title: "Define cost code on WBS line" slug: "define-cost-code-on-wbs-line" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:39:17Z published: 2026-03-20T17:46:03Z canonical: "docs.staedean.com/define-cost-code-on-wbs-line" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Define cost code on WBS line If you have defined a cost code standard and cost code level for a project quotation, you can define a cost code for each WBS line. ### Steps 1. Click **Advanced project management**. 2. Click **Project quotation**. 3. In the list, click the link in the selected row. 4. Click **Advanced WBS**. 5. Click **Edit**. 6. In the list, find and select the desired record. 7. In the **Cost code** field, enter or select a value. 8. Click **Save**. ## Related - [Use cost codes in work breakdown structure](/use-cost-codes-in-work-breakdown-structure.md)