--- title: "Define cost code on estimated costs and revenue" slug: "define-cost-code-on-estimated-costs-and-revenue" tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T08:39:27Z published: 2026-03-20T17:46:03Z canonical: "docs.staedean.com/define-cost-code-on-estimated-costs-and-revenue" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Define cost code on estimated costs and revenue If you have defined a cost code standard and cost code level for a project quotation, you can define a cost code for each WBS line. If the cost code level is **Transaction**, you can also define a cost code for each estimated-costs-and-revenue line. So, estimated-costs-and-revenue lines of one WBS line can have different cost codes. ### Steps 1. Click **Advanced project management**. 2. Click **Project quotation**. 3. In the list, click the link in the selected row. 4. Click **Advanced WBS**. 5. Click **Edit**. 6. Select a task having estimate lines. 7. Click the **Estimated costs and revenues** tab. 8. In the list, find and select the desired record. 9. In the **Cost code** field, enter or select a value. > [!NOTE] > **Note** > > You can only change the cost code on an estimate line if the default cost code level is set to **Transaction**. > > You can do so, on the root project node. > > You can also change the default setup in **Advanced project management parameters**. ## Related - [Use cost codes in work breakdown structure](/use-cost-codes-in-work-breakdown-structure.md)