--- title: "Creating Batch Jobs" slug: "creating-batch-jobs" tags: ["Task", "PLM"] updated: 2026-03-26T14:49:01Z published: 2026-03-26T14:49:01Z canonical: "docs.staedean.com/creating-batch-jobs" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Creating Batch Jobs Automating the import and posting processes ensures that new PLM data is regularly synchronized without manual intervention. Batch jobs can be configured for: - Importing XML files from the connector’s working path. - Posting open PLM staging journals after validation. **Import Batch Job** 1. Go to **Engineering Change Management > Setup > PLM Integration > PLM Systems**. 2. Select the relevant PLM system and click **Message**. 3. On the **Operation** tab, select **Run**. 4. Click **OK** to import XML files from the connector’s working path immediately. > [!NOTE] > Note > > - Check **Batch processing** toggle button to run import automatically at regular intervals. > - Select **Recurrence** to define the schedule (e.g., every hour or daily). > - Optionally configure **Alerts** to notify administrators of failures. **Posting PLM Staging Journal Batch Job** 1. Go to **Modules** > **Engineering Change Management** > **Periodic** > **PLM Integration** > **Post Staging Journals**. 2. Configure the parameters as required and click **OK**. When executed, all open staging journals are automatically posted. > [!NOTE] > Note > > To automate the process, enable **Batch processing**, set the **Recurrence** for the required frequency, and optionally configure **Alerts** to monitor success or errors. You can also define multiple threads for parallel processing in high-volume scenarios. Batch jobs are typically used in production to keep PLM and Dynamics 365 data synchronized automatically.