--- title: "Create WBS - Manually" slug: "create-wbs-manually" description: "Learn how to create a work breakdown structure in Project Control Suite, managing tasks, costs, and durations effectively for your projects." tags: ["Task", "Project Control Suite", "PCS"] updated: 2026-03-20T13:08:51Z published: 2026-03-20T17:46:03Z canonical: "docs.staedean.com/create-wbs-manually" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Create WBS - Manually A work breakdown structure (WBS) is a description of the work to be done for a project. It is a hierarchy of tasks that represents the composition of work, cost, and duration of each task. In Project Control Suite, you can add these types of lines to a project quotation work breakdown structure: - **Project** - You can add project lines to lines of type **Project**. - **Standard** - You can add tasks to lines of type **Project** and **Standard**. - **Summary** - You can add summary lines to lines of type **Project**. Summary lines don't have own estimate lines. Summary lines summarize the calculated values of the related detail lines. - **Detail** - You can add detail lines to lines of type **Summary** and **Detail**. ### Steps 1. Go to **Project management and accounting** > **Quotations** > **Project quotations**. 2. In the list, find and select the desired record. 3. Click **Advanced WBS**. 4. Click **Edit**. 5. Sub-task: Add a project. 1. In the list, find and select the desired record. 2. Click **New project**. 3. In the **Project name** field, type a value. 4. The project setup from the higher level (root node or parent project node) is inherited, unless the setup is changed at the project node. You can do this with the override option. Each sub-project can have a: Select **Yes** in the **Override** field. - Different project type. - Different project group. - Different project contract. - Special suffix which is used to create the sub-project ID. 5. In the **Project type** field, select an option. 6. In the **Project group** field, enter or select a value. 7. In the **Project contract ID** field, enter or select a value. 8. In the **Subproject ID suffix** field, type a value. 9. Click **OK**. 6. Sub-task: Add a task. 1. In the list, mark the selected row. 2. Click **New task**. 3. You can use activity templates to faster create tasks in the work breakdown structure. If you enter an activity template for a new task in the work breakdown structure, the default values of the activity template are copied to the task. In the **Activity template** field, enter or select a value. 4. In the **Task name** field, type a value. 5. Click **OK**. 7. Click **Save & Close**. 8. Close the page. 9. Close the page. 10. Go to **Default dashboard**. > [!NOTE] > **Notes** > > To change the task hierarchy, you can: > > - **Indent tasks**: Indent a task to make it a child of the task directly above it. > - **Outdent tasks**: Outdent a task to make it no longer a sub-task of its original parent task. > - **Move tasks up and down**: Move tasks up and down in the hierarchy of its parent task. Moving a task up or down has no effect on its effort, cost, dates, or duration. ## Related - [Create work breakdown structure](/create-work-breakdown-structure.md)