In a project contracting environment, a quotation or bid typically starts with a tender Microsoft Excel format.
These tenders often have large work breakdown structures. So, it is time-consuming to manually enter this in D365 F&SCM.
Use the WBS bid import to easily create a work breakdown structure based on a tender.
On bid import, the Microsoft Excel tender is imported into the project quotation work breakdown in D365 F&SCM.
The import is done via an integration journal.