--- title: "Configure Product release automation" slug: "configure-product-release-automation" tags: ["Task", "PLM"] updated: 2026-06-24T13:58:44Z published: 2026-06-24T13:58:44Z canonical: "docs.staedean.com/configure-product-release-automation" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Configure Product release automation Use this section to automatically release engineering products, BOMs, and routes from the PLM system to operational companies in D365 F&SCM. This automation reduces manual effort, ensures consistency, and provides full traceability. **Prerequisites** Before you configure this feature, ensure that: - A PLM system integration is set up. - At least one Engineering Change Category exists with a release policy. - Required product attributes are available. - You have access to the ECM workspace and PLM Systems setup. - Staging journals and ECOs are available. - Operational companies are configured. ![](https://cdn.document360.io/da662430-6a41-47b1-8c7e-7e4ac37a9756/Images/Documentation/Product%20Release%20Automation.png) **Automation setup** | Field | Description | | --- | --- | | Active | Specifies whether product release automation is enabled. - **Enabled (Yes)**: Product release automation runs automatically. Engineering products, BOMs, and routes are released from the PLM system to operational companies based on the defined setup. - **Disabled (No)**: Product release automation is turned off. All releases must be performed manually, and no automated release processes are triggered. | | Add engineering product category details | Adds a new engineering product category to the automation setup. | | Remove engineering product category details | Removes the selected category from the automation setup. |