If you use cost codes in your project quotations, you need to define the applicable cost code standard and cost code level.
The default cost code standard and default cost code level are defined in the Advance project management parameters.
You can change these defaults on a project quotation work breakdown structure.
1. | Click Advanced project management. |
2. | Click Project quotation. |
3. | In the list, select a project quotation. |
4. | Click Advanced WBS. |
5. | Click Edit. |
6. | Only one cost code standard can be used per quotation. So, select the root node. |
7. | Click the Setup tab. |
8. | In the Cost code standard field, enter or select a value. |
9. | Click Save. |
If you change the cost code standard or cost code level on a project quotation work breakdown structure, and already cost codes are defined, these are lost.