Use the Project tracking dimension to manage project-specific inventory. Activate this Project tracking dimension for the relevant tracking dimension groups. As a result, you can track project inventory through all transactions for the released products to which the tracking dimension group is assigned. The tracking is done in a similar way as for the Serial number and Batch number tracking dimensions.
Usually, you set up project inventory tracking for high-value products that require project-specific sourcing.
No project inventory tracking is required for products:
| 1. | Go to Product information management > Setup > Dimension and variant groups > Tracking dimension groups. |
| 2. | Click New. |
| 3. | In the Name field, type a value. |
| 4. | In the Description field, type a value. |
| 5. | Click Save. |
| 6. | In the list, find and select the desired record. |
| 7. | Select the Active check box. |
| 8. | Select the Blank receipt allowed check box. |
| 9. | Select the Blank issue allowed check box. |
| 10. | Select the Physical inventory check box. |
| 11. | Select the Coverage plan by dimension check box. |
| 12. | Select the For purchase prices check box. |
| 13. | Select the For sales prices check box. |
Because the Primary stocking check box is cleared, you can still purchase, produce, or sell the products anonymously, if required.
| Related to | Notes |
|---|---|
|
Setting up and maintaining Project Control Suite |
  |