--- title: "Multi-level BOM explosion" slug: "multi-level-bom-explosion" description: "Improve multi-level BOM explosion for pharmaceutical manufacturing to streamline raw material requirements and production planning." tags: ["Life Sciences", "Supply Chain Management"] updated: 2026-06-25T10:24:11Z published: 2026-06-25T10:24:11Z canonical: "docs.staedean.com/multi-level-bom-explosion" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Multi-level BOM explosion Life Sciences Supply Chain Management improves Microsoft’s standard **Explode BOM** feature to allow users to explode item requirements for multi-level formula items typically involved in pharmaceutical manufacturing. The explosion process results in a list of item requirement lines for all the raw materials involved in product manufacturing. The **Multi-level BOM explosion** button is available in the item requirement form (**Project management and accounting > Project > All projects > Plan > Item requirements**) and allows users to perform the explosion process. The **Group by item** functionality allows grouping multiple item requirements lines into a single one if related to the same item number and storage dimensions (Site, Warehouse, etc.). The system considers the formula to be exploded for the original item requirement lines as follows: 1. The formula specified in the **Sub-BOM** field (**Other** tab **> Sub-BOM**), if any. 2. The active formula of the manufactured item, considering the item requirement line site and dates. For sub-level manufactured products, the active formula is exploded. In case of a missing active formula, it is possible to define the validation method the system must apply during the multi-level explosion process by setting the **Multi-level BOM explosion check method** field in the item card (**Product information management > Products > Released products**). Possible values are: - **No check**: the line without an active formula is not exploded. No messages are displayed to the user. - **Warning only**: the line without an active formula is not exploded. A warning message is displayed to users to inform them which item has a missing active formula. - **Not allowed**: the explosion process is not executed if a line does not have an active formula. An error message is displayed to users to inform them which item has a missing active formula.