--- title: "Create project rental quotation with Project Control Suite" slug: "create-project-rental-quotation-with-project-control-suite" description: "Learn to create project rental quotations with Advanced WBS and configure Project Control Suite settings in STAEDEAN Rental Management." tags: ["Rental Management", "RM", "Task"] status: "new" updated: 2026-11-20T13:02:41Z published: 2026-11-20T13:02:41Z canonical: "docs.staedean.com/create-project-rental-quotation-with-project-control-suite" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Create project rental quotation with Project Control Suite With the STAEDEAN Rental Management and Project Control Suite integration, you plan a project rental quotation in the Advanced WBS. To do so, you create the quotation with **Show WBS with units and quantities** set to **Yes**. You can only set this field when you create the quotation. The other Project Control Suite settings are on the quotation header. You can change them later. > [!NOTE] > Prerequisite > > The STAEDEAN Rental Management and Project Control Suite integration must be set up. For more information, see [Set up Rental Management and Project Control Suite integration](/equipment-rental/docs/set-up-rental-management-and-project-control-suite-integration). ## Create the quotation 1. Go to **Rental order management** > **Project rental quotations** > **Project rental quotations**. 2. Click **New**. The **Create project rental quotation** dialog opens. 3. In the **Account type** field, select **Customer** or **Prospect**. 4. In the **Customer account** field, select the customer. 5. When you are asked **Transfer customer information?**, select an option. The settings of the customer are copied to the quotation, such as the contact, address, invoice profile, rental calendar, and rate code. Options: - **Yes**: The settings are copied. You can still change them. - **No**: The settings stay empty and you must enter these manually, at least the mandatory ones. 6. In the **Customer** section, review the defaulted fields, such as **Contact**, **Delivery address**, and **Project ID**. Change them if needed. 7. In the **Show WBS with units and quantities** field, select **Yes**. You find the field in the **Forecast quantities and scheduled units** group, at the bottom of the **Customer** section. The default comes from the Project Control Suite parameters. Options: > [!NOTE] > Note > > You can only change this field in this dialog. After you click **OK**, the field is read-only. - **Yes**: You plan the quotation in the Advanced WBS and generate the quotation lines from the Advanced WBS. - **No**: You use the standard project rental quotation. For more information, see [Create and send project rental quotation](/equipment-rental/docs/create-and-send-project-rental-quotation). 8. In the **Rental** section, review the defaulted fields, such as **Invoice profile**, **Rental calendar**, **Rate code**, and the estimated dates. Change them if needed. 9. In the **Rental dates** section, review the dates and change them as needed. > [!NOTE] > Note > > If you have set the **Estimated project end date**, that is the default **Expected off-rent date**. If not, the **Expected off-rent date** is the only required date to fill in. > > The other dates default to today. 10. Click **OK**. The project rental quotation is created with the status **Created**. On the Action Pane, under **Project quotation** > **Maintain**, **Advanced WBS** and **Advanced WBS Edit** are now available. ## Set the Project Control Suite settings The Project Control Suite settings of the quotation are in the **Project control suite** section. You can only change them when **Show WBS with units and quantities** is **Yes**. 1. Go to **Rental order management** > **Project rental quotations** > **Project rental quotations**. 2. In the list, open the project rental quotation. 3. On the **Header** tab, expand the **Project control suite** section. 4. In the **Enforce locking for edit** field, select an option. Locking works as in Project Control Suite. Options: - **Yes**: **Advanced WBS Edit** only shows the subprojects that you have locked. - **No**: All subprojects are shown. 5. In the **Auto scheduling** field, select an option. The default comes from the Project Control Suite parameters. You can change this setting at any time. Options: - **No**: The task dates that you enter are kept. This is recommended, because rental items in one task often need different end dates. - **Yes**: The task dates are scheduled automatically. 6. If you prepare the Advanced WBS in Excel, set **Generate WBS ID** to **Yes**. The WBS IDs of the lines that you add in Excel are generated when you publish from Excel. For more information, see [Edit Advanced WBS in Excel with rental fields](/equipment-rental/docs/edit-advanced-wbs-in-excel-with-rental-fields). 7. Click **Save**. ## Related - [Plan project rental quotation in Advanced WBS](/plan-project-rental-quotation-in-advanced-wbs.md) - [Create and send project rental quotation](/create-and-send-project-rental-quotation.md) - [Edit Advanced WBS in Excel with rental fields](/edit-advanced-wbs-in-excel-with-rental-fields.md) - [Set up Rental Management and Project Control Suite integration](/set-up-rental-management-and-project-control-suite-integration.md)