--- title: "Build Advanced WBS for project rental quotation" slug: "build-advanced-wbs-for-project-rental-quotation" description: "Learn how to build an Advanced WBS for project rental quotations, define project setup, add subprojects and tasks, and schedule rental items." tags: ["Rental Management", "RM", "Task"] status: "new" updated: 2026-11-20T13:02:41Z published: 2026-11-20T13:02:41Z canonical: "docs.staedean.com/build-advanced-wbs-for-project-rental-quotation" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # Build Advanced WBS for project rental quotation The work breakdown structure (WBS) describes the work to be done for the rental project. You build it in the Advanced WBS of the project rental quotation. You define the project setup, and add subprojects and tasks. The Advanced WBS has these line types: - **Root project line**: Created automatically for the quotation. When you transfer the quotation to a new project, it becomes the main project. - **Project line**: A subproject under the root project line or another project line. It becomes a subproject when you transfer the quotation. - **Task**: An activity under a project line or another task. You add the estimate lines, such as rental items, to tasks. After the transfer, each rental order line refers to the project and activity of its task. You can add a task under a task, but you can't add a project line under a task. For more information, see [Task types in work breakdown structure](/manufacturing/docs/task-types-in-work-breakdown-structure). > [!NOTE] > Prerequisite > > The STAEDEAN Rental Management and Project Control Suite integration must be set up. For more information, see [Set up Rental Management and Project Control Suite integration](/equipment-rental/docs/set-up-rental-management-and-project-control-suite-integration). > > The project rental quotation must be created with **Show WBS with units and quantities** set to **Yes**. For more information, see [Create project rental quotation with Project Control Suite](/equipment-rental/docs/create-project-rental-quotation-with-project-control-suite). ## Open the Advanced WBS for editing 1. Go to **Rental order management** > **Project rental quotations** > **Project rental quotations**. 2. In the list, select the project rental quotation. 3. On the Action Pane, click **Project quotation** > **Maintain** > **Advanced WBS Edit**. The **Work breakdown structure for** page opens, ready for editing. **Advanced WBS** opens the same page read-only, with an **Edit** button. > [!NOTE] > Note > > If **Enforce locking for edit** is **Yes** on the quotation, you only see the subprojects that you have locked. Locking works as in Project Control Suite. ## Define the project setup Subprojects inherit the setup of the root project line, unless you override it. So, define the setup of the root project line first. 1. On the **Tasks and estimates** tab, select the root project line. 2. On the **Setup** tab (lower pane), check that the **Project type** field is set to **Time and material**. The default comes from the Project Control Suite parameters. A rental project is a time and material project, also when it uses progress billing. 3. In the **Project group** field, select the project group. The default comes from the Project Control Suite parameters. 4. In the **Project contract ID** field, select a project contract. To create a project contract, click the plus button. > [!NOTE] > Note > > Define a project contract on the root project line before you transfer the quotation. Otherwise, the transfer stops with the message “The project contract is not specified.” 5. Set the **Use progress billing** field. The default comes from the Project Control Suite parameters. This setting decides how you invoice the rental project. For more information, see [Invoice rental project](/equipment-rental/docs/invoice-rental-project) and [Use progress billing for project rental](/equipment-rental/docs/use-progress-billing-for-project-rental). Options: For what progress billing needs on the tasks, see [Use progress billing](/manufacturing/docs/use-progress-billing). - **Yes**: You invoice with progress bills. The rental order lines are not chargeable. - **No**: You invoice with project invoice proposals. The rental order lines are chargeable. ## Add a subproject Add a subproject for each part of the rental project that you want to manage as a separate project. 1. Select the root project line, or the project line to add the subproject to. 2. Click **New project**. 3. In the **Project name** field, enter a name. 4. To use a different setup for this subproject, set **Override** to **Yes**, and fill in the setup fields. Without override, the subproject uses the setup of its parent. You can override the **Project type**, **Project group**, **Project contract ID**, **Use progress billing**, and **Subproject ID suffix**. The suffix is used to create the subproject ID. A subproject without progress billing is left out of the progress bill. 5. Click **OK**. ## Add a task 1. Select the project line or task to add the task to. 2. Click **New task**. 3. In the **Task name** field, enter a name. > [!NOTE] > Note > > Activity templates are not supported with the integration. Leave the **Activity template** field empty. 4. In the **Category** field, select a category. 5. Fill in the other **Task** fields as needed. 6. If you use progress billing, also fill in the **Calculation** fields like **Group** and **Forecast quantity**. > [!NOTE] > Note > > In rental, you always rent a discrete quantity of items. Therefor, consider using a calculation group with a variable of type **Percentage** and 100%. 7. Click **OK**. 8. In the **Task start date** and **Task end date** fields, enter the dates of the task. The task dates become the default on-rent date and expected off-rent date of the rental items that you add to the task. You can still change the dates per line. > [!NOTE] > Note > > - If you change the task dates later, the rental dates of existing lines don't change. > - Changing the task start and end dates can change the project start and end dates. > - Group rental items with the same rental period in one task. With **Auto scheduling** set to **No**, the dates that you enter are kept. > [!NOTE] > Note > > To change the task hierarchy, you can indent, outdent, or move a task, and change a task to summary or detail. This works as in Project Control Suite. For more information, see [Task types in work breakdown structure](/manufacturing/docs/task-types-in-work-breakdown-structure). ## Related - [Plan project rental quotation in Advanced WBS](/plan-project-rental-quotation-in-advanced-wbs.md) - [Set up Rental Management and Project Control Suite integration](/set-up-rental-management-and-project-control-suite-integration.md) - [Create project rental quotation with Project Control Suite](/create-project-rental-quotation-with-project-control-suite.md) - [Bill rental project](/invoice-rental-project.md)