--- title: "(Re)build 'Connectivity' business events" slug: "rebuild-connectivity-business-events" description: "Rebuild 'Connectivity' business events by managing message events, ensuring proper setup from Test to Production, and maintaining activations effectively." tags: ["Task topic"] updated: 2026-03-20T08:04:51Z published: 2026-03-20T17:44:34Z canonical: "docs.staedean.com/rebuild-connectivity-business-events" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.staedean.com/llms.txt > Use this file to discover all available pages before exploring further. # (Re)build 'Connectivity' business events You can rebuild the business events of category '**Connectivity**'. You can do so, for example, if: - Changes are made to the message business events. Changes can be, for example, when message business events are deleted or the **Send business event** field is changed to '**Never**'. - The connectivity setup, including the message business events are moved from a Test environment to a Production environment. As a result: - All existing business events of category '**Connectivity**' are deleted from the business events catalog. - Based on the message business events, business events are created. So, a business event is created for message business events that: - Had a related business event. - Didn't have a related business event. > [!NOTE] > **Note** > > - If a message business event is deleted while a related business event exists, on rebuild, the related business event is deleted and not rebuilt. > - A business event is not (re)built if for the message business event the '**Send business event**' field is set to '**Never**'. > - If a '**Connectivity**' business event is activated before rebuild, the activation stays after rebuild is done. However, if for a message business event the **Business event ID** is changed, the activation is undone. > - If connectivity setup is moved from Test to Production, the endpoints must be set up, activated, and configured again. ### Steps 1. Click **Connectivity studio - Integration Design**. 2. Click **Projects**. > [!NOTE] > **Note** > > Your currently active project is opened. This is the project as shown in the **Project** field on the Integration design workspace. 3. On the **Action Pane**, click **Design**. 4. Click **Message business event**. 5. Click **Rebuild connectivity events**. 6. Close the page. 7. Close the page. ## Related - [Connectivity business event content](/connectivity-business-event-content.md)