If you set up a process flow, usually, you first define the things to be done in the process. So, you first add the activities or (sub-)flows. This activity describes how to add a sub-flow to a flow.
To add a sub-flow, you can choose from the flows that are defined for the current solution and its referenced solutions.
If you add a sub-flow to a flow, and you select:
1. | Click Business process modeling. |
2. | Click the Business processes tab. |
3. | Click Edit hierarchy. |
4. | In the tree, select 'a node'. |
5. | Click Design. |
6. | Click Sub-process to open the drop dialog. |
7. | In the list, find and select the desired record. |
8. | Click OK. |
9. | Click Save. |
  |
Note: If you have changed the sub-flow text in the flow design, click outside the sub-flow element before you save the flow design. |
10. | Close the page. |