If you set up a process flow, usually, you first define the things to be done in the process. So, you first add the activities or (sub-)processes. This activity describes how to add an existing activity to a flow.

If you add an activity to a flow, it is automatically added to the lane for the related role. If, in the flow, no lane is available for the role, a new lane is created.

You can choose an existing activity from these lists:

  • [Area] (first tab of the dialog): only the activities are shown that are in the same area as the process of the flow. The shown activities are of the current solution and its referenced solutions.
  • All: all activities of the current solution and its referenced solutions are shown.


Standard procedure

1. Click Business process modeling.
2. Click the Business processes tab.
3. Click Edit hierarchy.
4. In the tree, select 'a node'.
5. Click Design.
6. Click Activity to open the drop dialog.
7. In the list, find and select the desired record.
8. Click OK.
9. Click Save.
 

Note: If you have changed the activity text in the flow design, click outside the activity element before you save the flow design.

10. Close the page.