When you create a data entry workflow step, the applicable dependencies are automatically created. The dependencies are created based on a combination of the selected step(s) and the type of step you create.

You can manually add dependencies or change existing dependencies. For example, if you add an additional step between existing steps, check and add the desired dependencies.

You can also remove a dependency for a selected step.


Standard procedure

1. Go to Data entry workflow > Design > Data entry workflow templates.
2. In the list, click the link of the desired data entry workflow template.
3. Click Edit.
 

Note: Make sure the Workflow diagram section is in edit mode.

4. Sub-task: Add dependency.
  4.1 In the Workflow diagram, select the desired step, and click Add dependency.
  4.2 In the list, find and select the desired steps.
 

Note: You can only add a dependency between the selected step and a step that is positioned before the selected step.

  4.3 Click OK.
5. Sub-task: Remove dependency.
  5.1 In the Workflow diagram, select the desired step, and click Remove dependency.
  5.2 In the shown list, all dependencies of the selected step are shown.
  Click the dependency that you want to remove.

Provide feedback