If you have solved the errors in a message run, you can run it again. The message is re-run in the company in which it was originally run. As a result:
| 1. | Click Connectivity studio Integration operations. |
| 2. | On the History errors tab, in the list, find and select the desired message run. |
| 3. | Click History. |
| 4. | On the Action pane, on the History tab, click Run. |
| 5. | Define how the message is run: - Direct: The message is run immediately. When you click OK, you must wait till the message is processed before you can proceed with your work. - Asynchronous: The message is run (almost) immediately in the background. If you click OK, you can proceed with your work while the message runs. - Batch: The message is run in batch. If you click OK, you can proceed with your work. The message is scheduled and run by the batch framework. |
|   | In the Run asynchronously field, select an option. |
|   |
Note: If the Run mode is Background or Batch, you must also define the batch group. |
| 6. | If you have selected the run mode Asynchronous or Batch, define the batch group that is used to run the message. |
|   | In the Batch group field, enter or select a value. |
| 7. | Click OK. |
| 8. | Close the page. |
| Related to | Notes |
|---|---|
|
Analyze message history |
  |
|
Monitor message history |
  |
|
Monitor message history |
  |
|
Monitor message history |
  |