You can change the sequence of the record mappings to make sure the related data is exchanged in the right order.
| 1. | Click Connectivity studio Integration Design. |
| 2. | On the Message tab in the list, find and select the desired message. |
| 3. | Click Edit. |
| 4. | You can move a selected record up in the record mapping sequence. |
|   | In the Mapping section, in the Target record pane, find and select the desired record. |
| 5. | Click Move up. |
| 6. | You can move a selected record down in the record mapping sequence. |
|   | In the Mapping section, in the Target record pane, find and select the desired record. |
| 7. | Click Move down. |
| 8. | Close the page. |
| Related to | Notes |
|---|---|
|
Set up record mapping |
  |